My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2131
>
2800 - Aboveground Petroleum Storage Program
>
PR0535925
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:37:12 AM
Creation date
10/2/2018 11:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535925
PE
2833
FACILITY_ID
FA0009893
FACILITY_NAME
NORTHERN CALIF POWER - LODI
STREET_NUMBER
2131
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2131 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCPA Pressure Test Record Form <br /> NONTMfOx CC:ifOnm�a0µf11 nSfnC'r <br /> This form is required for documenting the results of every pressure test.Both the technician performing the test and the inspector witnessing it must sign. <br /> Copies(electronic or hardcopy)of the completed form are kept by the plant permanently. Keep this form and the Approved Pressure Test Procedure together <br /> as a single document. <br /> System Decription <br /> Pressure Test System ID(Description): <br /> NCPA LODI CT1 HYDROTEST OF UNDERGROUND DIESEL PIPE <br /> Test Parameters <br /> Type of test: ■ Hydrostatic ❑ Pneumatic <br /> Required test pressure:105 Test fluid: Diesel Actual test fluid temperature:68 F <br /> Test starting time:2/25/16 at 1150 AM Test ending time:2/25/16 at 12:36 PM <br /> Test duration(ending—starting time): 46 MINUTES Actual holding time: 10 minutes at 50 psig,100 psig,50 psig. A total of 30 minutes. <br /> Test Equipment—Pressure Gauge <br /> Type: Bourdon Tube Pressure Guage(316 SS Tube and Pressure range: 0-300 psig Calibration date: 3/19/2015,due 3/19/2016 <br /> Connection),Designed to ASME 640.100 <br /> Actual test pressure: 0-50 psig(1150-1205),50-105(12:05-12:22),105-50(1224-1236) <br /> Environmental Controls <br /> Exclusion zone for safety of people(actual safe distance): Front gate. <br /> Test area controls(barricades,signage,etc.): Caution Tape Actual disposal of test fluid: Placed back in the main diesel tank. <br /> Results <br /> Inspection: ■ PASS ❑ FAILED(explain) <br /> Pressure Test: Is PASS ❑ FAILED(explain) <br /> Remarks: <br /> 1150-1205: PRESSURIZED U/G DIESEL PIPE TO 50 PSIG TO CHECK FOR LEAKS. HELD AT 50 FOR 10 MINUTES. NO LEAKS. NO DECREASE IN PRESSURE. <br /> 1210-1222: INCREASED PRESSURE FROM 50 PSIG TO 105 PSIG. HELD AT 105 FOR 10 MINUTES. NO LEAKS. NO DECREASE IN PRESSURE. <br /> 1224-1236: DECREASED PRESSURE FROM 105 PSIG TO 50 PSIG. HELD AT 50 FOR 10 MINUTES. NO LEAKS. NO DECREASE IN PRESSURE. <br /> 1236: DECREASED PRESSURE FROM 50 TO ZERO. TEST COMPLETED. NO ISSUES. NO LEAKS. ALL SATISFACTORY. <br /> NOTE: SEE ATTACHED PERFORMANCE MECHANICAL,INC REPORT FOR ADDITIONAL INFORMATION. <br /> Signatures <br /> Technician Performing Test:(print): Signature: SEE PMI REPORT Date:2/25/2016 <br /> PERFORMANCE MECHANICAL,INC(PMI)-JACK <br /> WOOD <br /> Inspector/NCPA Management Witnessing Test: Signature: Date: 2/25/2016 <br /> (print): VINNIE VENETHONGKHAM <br /> MAY 232016 <br /> 8/12/15 by)/lame Vcnctbongkhem <br />
The URL can be used to link to this page
Your browser does not support the video tag.