My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2131
>
2800 - Aboveground Petroleum Storage Program
>
PR0535925
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:37:12 AM
Creation date
10/2/2018 11:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535925
PE
2833
FACILITY_ID
FA0009893
FACILITY_NAME
NORTHERN CALIF POWER - LODI
STREET_NUMBER
2131
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2131 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Plug all test, drain, and vent ports that are not required for the test. All <br /> low-pressure filling lines, if any and all other lines not subject to the test <br /> pressure shall be disconnected, plugged, or isolated by valves or other <br /> suitable means. <br /> 8. If the section of pipe being tested is isolated from other sections by in-line <br /> valves, ensure the portion not being tested is open to the atmosphere. <br /> Start of Test— System Pressurization <br /> 9. Ensure that the test area is properly barricaded with danger taped, or <br /> otherwise controlled to prevent unauthorized personnel entry. <br /> 10. Apply a preliminary pressure test of 50 psig. Hold for 10 minutes. <br /> 11. Visually inspect pipe, fittings, and other appurtenances for evidence of <br /> leakage. <br /> 12. Record data in the Pressure Test Record Form. <br /> 13. Apply the test pressure of 105 psig. <br /> 14. Hold the maximum test pressure for 10 minutes. The NCPA Management <br /> or Designee must observe this step. <br /> 15. Visually inspect pipe, fittings, and other appurtenances for evidence of <br /> leakage. If leaks are detected during this step, or at any time during the <br /> test, or if there is evidence of structural distortion, relieve the pressure and <br /> consult NCPA Management or Designee for instruction. <br /> 16. After the required 10 minutes, reduce the pressure to 50 psig for the <br /> Diesel Oil Pipe and hold here to conduct examination for leakage. <br /> Examination for leakage detected by soap bubble or equivalent method <br /> shall be used on all joints and connections. The piping system, exclusive <br /> of possible localized instances at pump or valve packing, shall show no <br /> evidence of leaking. <br /> 17. Obtain confirmation of a successful leakage examination by NCPA <br /> Management or Designee. <br /> 18. Complete the following form, Pressure Test Record Form. <br /> 19. Remove the pressure. <br /> 20. Return relief devices to normal configuration, if any. �— <br /> MAY 232016 <br /> 6 <br /> _Wr X.' N <br />
The URL can be used to link to this page
Your browser does not support the video tag.