My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2131
>
2800 - Aboveground Petroleum Storage Program
>
PR0535925
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:37:12 AM
Creation date
10/2/2018 11:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535925
PE
2833
FACILITY_ID
FA0009893
FACILITY_NAME
NORTHERN CALIF POWER - LODI
STREET_NUMBER
2131
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2131 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The API 653 has a formula to calculate the life expectancy based on corrosion rate. If the corrosion rate <br />is low and the corrosion allowance, excess tank wall thickness, is high you can get very high expected <br />tank life. The tank requires inspection at a minimum of every 20 years by the API 653 standard. <br />John <br />From: Vinnie Venethongkham fmailto:Vinnie.Venethongkham@ncpa.com] <br />Sent: Wednesday, September 14, 2016 5:53 PM <br />To: John Strandberg <rwaterguy@rwaterguy.com> <br />Subject: Re: Questions on the SPCC Plan and API Report <br />Please answer the last question as well. Please let me know your availability. Thanks. <br />Sent from my iPhone <br />On Sep 14, 2016, at 5:15 PM, John Strandberg <rwaterguy@rwaterguy.com> wrote: <br />Vinnie; <br />I have removed them and claimed them as operating equipment. If they want a table <br />showing them as operating equipment, I can do that. Also we need to schedule the last <br />site inspection. <br />John <br />From: Vinnie Venethongkham [mailto:Vinnie.Venethongkham@ncpa.com] <br />Sent: Wednesday, September 14, 2016 3:02 PM <br />To: John Strandberg <rwaterguy@rwaterguy.com> <br />Subject: Questions on the SPCC Plan and API Report <br />Importance: High <br />Hi John, <br />I received a call from the CUPA yesterday regarding the SPCC plan for Lodi M. They <br />were comparing the previous plan, specially, the sources listed were not the <br />same. Please help me address these questions: <br />1. Why is the gas compressor not listed as a source on table, page 19? <br />2. Why is the turbine lube oil tank not listed as a source on table, page 19? Is it <br />included with source 7, Oil Cooler? <br />3. Question on the Diesel Fuel Storage Tank API 653 Inspection Report, Page <br />3. Why is the estimated remaining life 599.898? <br />Thank you, <br />Vinnie <br />CONFIDENTIALITY NOTICE: This communication with its contents may <br />
The URL can be used to link to this page
Your browser does not support the video tag.