Laserfiche WebLink
Facility Em to ee Training PaRe 2 Of 2 <br /> All facility employees have received the required on-the-job training within the past year, x <br /> A11 facility employees hired witlaio the past 30 days have received the required on the job trai:oiztg. X <br /> montw Inspection— <br /> X N NA Date Done <br /> Monitoring system certification,(within past 12 months) X 4-21-17 <br /> Spill Bucket testing completed(within past I2 months) X 4-21-17 <br /> Ltak Detector-mechanical/electrooic for most sites(within past 12 months) X 4-21-17 <br /> Ae above are usually done together on an annual basis for local regulator. <br /> Lice Tightness(usually upon construction or when no positive shutdown) X <br /> Tank Tightness(Usually only after construction or when using SIR) X <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X 2-12-15 <br /> Other testing or maintenance completed as required.List them below: <br /> Test/Maintenaace: <br /> TesdMaintenauce: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED Yes No ❑ NA El <br /> Comments: <br /> PERfs"�ri.�� �lr�r_e" <br /> Items Requiring Follow-up Actions: <br /> AST ALARM CLEARED ON ITS OWN <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may rewire follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or,if approved by the local agency, off-site at a readily <br /> available location. <br /> 75 <br />