Laserfiche WebLink
' V Rev. aAvzooe <br />V UST Facility ID Training Date <br />OPERATORSIN (o l7 <br />vaw.� ai...... <br />JUN 2 2 2015 <br />Training Acknowledgement Form,, VIRONMENTAI_ <br />"Facility Employee" UST Compliance Refresher Traininq <br />0 <br />'Pt L"OT -FLY I Ii.� 3 -tom 1p t'1 <br />Facility <br />Employee (FE) UndergrOLInd Storage Tank (ILIST) Compliance Refresher Training PeJejv <br />FE t>",11 it <br />FbNWwed <br />CompAarm Expeciladons DO has Reviewed wO FE <br />t. The FE can explain how the facility's underground storage tank system is monitored — tanks, product lines, tank top sumps <br />and under -dispenser containment (UDC). <br />2. The FE can explain their roles and responsibilities at the facility in reacting to a facility monitoring system alarm, leak or <br />spill. The FE can locate emergency contact information and can explain that any environmental alarms or spills require a <br />response and resolution. <br />3. The FE can demonstrate he/she can properly complete entries to the Monitoring System Daily Check (Alarm History) Form <br />and can verbalize the purpose of the forth is to document daily verification that the facility's monitoring system is <br />continuously monitoring the UST system with visual and audible alarm capabilities. <br />4. The FE can demonstrate he)she can properly complete entries to the Alarm Response Log using provided alarm examples <br />and can verbalize the purpose of the form. The FE acknowledges any environmental monitoring system alarm must be <br />logged into the Alarm Response Log along with details concerning the resolution of the alarm. <br />5. The FE can find the UST compliance records repository used by the facility and can locate the facility's current Monitoring <br />System Certification. <br />6. The FE can explain the purpose of the Designated Operator (DO) and what the facility is expected to do to respond to a <br />DO finding on the DO's monthly Visual Inspection Checklist (VIC). <br />l— <br />7, The FE can explain the purpose of the facility's Monitoring Plan and can demonstrate knowledge about periodic <br />•/,/ )��, <br />compliance testing requirements. <br />B. The FE can explain the purpose of the facility's Release Response Plan and can demonstrate knowledge about spill/leak <br />response ('worst case discharge' and 'most likely discharge") including completing the facility's Spill Log. <br />9. The FE can indicate the location of emergency shut off switches and explain when they should be used. The FE can <br />indicate the location of the facility's spill response kit(s) to be used in the event of a spill. <br />The FE can explain how long tank system -related testing records and other documents should be kept by the facility <br />(minimum three in the binder or records repository five on site, for the lifetime of the tanks offsite). <br />years years <br />Facility Employee Acknowledgement: <br />The Designated Operator for my facility, identified below, has reviewed with me the expectations noted above concerning my roles and <br />responsibilities in keeping my facility's underground storage tank (UST) system in compliance with California's UST regulations as well as <br />any local requirements of the Certified Unified Program Agency (CUPA) enforcing these regulations at my facility. <br />I understand and accept the duties and responsibilities that I am expected to perform with regard to my facilitys Monitoring Plan and <br />Release Response Plan. These include implementation of facility best management practices, response to monitoring system alarms, <br />response to spills at the fueling islands or overfills at the tank pad, contacting identified emergency contacts in the event of a spill or <br />release of product and the proper documentation of these activities. <br />I have asked any questions I may have had concerning these expectations until I was satisfied 1 understood them. I understand that I am <br />responsible in whole or in part for maintaining the required UST compliance documents for my station. I will ensure that these records will <br />be kept i 7tdance with instructions provided to me by the CUPA having jurisd ctio over my station. <br />Fac Employee Name (Please Print) FE Signature and Date <br />Trained by: <br />Lance York 5296385-UC/Aug. 12, 2016 <br />Facility DO Name 1604griature. International Code Council (ICC) Certification f <br />confirm Ion FE refresher training and Expiration Date <br />M <br />