My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2200 - Hazardous Waste Program
>
PR0537764
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2024 10:40:10 AM
Creation date
10/2/2018 4:24:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0537764
PE
2220
FACILITY_ID
FA0004525
FACILITY_NAME
West Lane Chevron
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />304 E. Weber Ave., Third Floor • Sooclaon, CA 95202-2708 • Phone (209) 468-3420 <br />Donna Herm, REH.S., Director <br />ENVIRONMENTAL HEALTH <br />SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY <br />PERMIT TO OPERATE <br />Program Permit Permit <br />Record ID Number Program Code and Description Valid <br />PR051426 PT0010463 2220 - SMALL QUANTITY HAZARDOUS WASTE GENERATOR FACILITY 1/1/2002 To 12131/2002 <br />Hazardous Waste Generator Program: <br />California Health and Safety Code Div_ 20, Chap_ 6.5:Art. 2.13 Sec _25100 et seg, and Title 22 Califomia Code of Regulations, Chap_ 20. --------- <br />PRO23260 2300 - UNDERGROUND STORAGE TANK FACILITY 1/1/2002 To 12/31/2002 <br />Underground Storage Tank Proaram: <br />California Health and Safety Code Div. 20, Chap. 6.7 and Title 23 Califomia_Code of Regulations Chap. 16, <br />2360 2 390002326010260102 <br />2362 1 390002326010260101 <br />PT0006438 12,000 <br />PT0006437 12,000 <br />'illyYi <br />Underground Storage Tank Permit Conditions <br />REGULAR UNLEADED <br />REGULAR UNLEADED <br />Active, billable <br />Active, billable <br />DOUBLE WALLED <br />DOUBLE WALLED <br />Continuous Interstitial <br />Monitoring <br />Continuous Interstitial <br />Monitoring <br />1) The Permit to Operate will become void if Annual Permit Fees and Service Fees are not paid and/or the UST system(s) fails to remain in compliance with these Permit Conditions. <br />2) In order to maintain the operating penult, the owner and operator shall comply with the H&S Code, Div. 20, Chap. 6.7 and 6.75; and CCR, Tide 23, Chap. 16 and 18, as well as any <br />conditions established by San Joaquin County. <br />3) If the Tank Operamr(s) is different from the Tank Owner, or if the Permit to Operate is issued to a person other than the owner or operator of the tank, the Permittee shall ensure that <br />both the Tank Owner and tank Operator receive a copy of the permit. <br />4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Department (SHE)) and are considererd UST Permit Conditions. The <br />approved monitoring, response, and plot plans shall be maintained onsile with the permit <br />5) The Permittee shall comply with die monitoring procedures referenced in this permit <br />6) The Permittee shall perforin testing and preventive maintenance on all leak detection monitoring equipment annually, or more frequently ifspecified by the equipment manufacturer, <br />and provide documentation of such servicing to this office. <br />7) In the event of a spill, leak, or other unauthorized release, the Permitee shall comply with the requirements of Title 23 CCR, Chap. 16, Art. 5, and the approved Emergency Response <br />Plan. <br />8) Written records of all monitoring performed shall be maintained on-site by the operator and be available for inspection for a period ofat least three years from the date the monitoring <br />was performed. <br />9) The EHD shall be notified of any change in ownership or operation of the UST system within 30 days of such change. <br />10) Upon any change in equipment, design or operation of the UST system (including change in tank contents or usage), the Permit to Operate will be subject to review, modification or <br />revocation. <br />11) Construction, repair and/or removal permits are required from the EHD prior to any change, repair or removal of UST system equipment <br />12) The Permittee shall submit an annual report documenting compliance with the UST Permit Conditions within 30 days of the anniversary date of the issuance of this permit. <br />13) This Permit to Operate shall not be considered permission to violate any laws, ordinances or statutes of any other Federal, State or Local agency. <br />14) A "Conditional" Permit maybe revoked if corrections specified on the inspection report are not completed by the date(s) indicated. <br />PERMITS TO OPERATE are NOT TRANSFERABLE <br />and may be SUSPENDED or REVOKED for cause. <br />PERMIT(s) Valid only for: BP WEST COAST PRODUCTS LLC <br />DBA: ARCO STATION <br />Tank Owner: ARCO PRODUCTS CO <br />THIS FORM MUST BE DISPLAYED CONSPICUOUSLY ON THE PREMISES <br />Regulated Facility ARCO AM/PM* <br />9484 WEST LN <br />STOCKTON. CA 95210 <br />7023.rpt <br />Facility ID FA0004525 <br />Amount ID AR0004216 <br />Issued 3/29/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.