My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
650
>
2300 - Underground Storage Tank Program
>
PR0516807
>
COMPLIANCE INFO 1999-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:28:31 AM
Creation date
10/4/2018 9:07:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1999-2003
FileName_PostFix
1999-2003
RECORD_ID
PR0516807
PE
2381
FACILITY_ID
FA0012818
FACILITY_NAME
BEST DEAL AUTO SALES
STREET_NUMBER
650
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13929010
CURRENT_STATUS
02
SITE_LOCATION
650 E MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 0 <br />PUBLIC HEALTH SERVICES <br />SAN JOAQ fN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Karen Furst, M.D., M.P.H., Health Officer <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/463-3420 <br />GENERAL INSTRUCTIONS: <br />Submit all information in triplicate. Answer all questions, leaving no blanks. Gne copy will be returned <br />to the applicant with comments. <br />[ j 2. Include a detailed site map on a teoarate sheet of paper, showing the location of the tanks(s), piping, <br />streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water <br />wells, buildings, underground pub.ic utility lines (including water, sanitary sewer and storm sewer), and <br />distance of piping from tank to dispensers. If underground utilities are not inc'..ded on the site map, you <br />must state in writing that USA Dig will be contacted prior to excavation activities. <br />[ ] 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". Not : SamplinK <br />firm shall be an independent third Flarty from the contractor. <br />[ ] 4. Complete page 9, "Authorizatiun to Release". This form must be signed and dated by the <br />OWNER/OPERATOR of the faci iry. <br />(] 5. Submit the appropriate fees and-:omplete page 11, the "Underground Storage Tank Program Fee <br />Worksheet". <br />[ ] 6. Complete all questions on page 13, the Public Health Services -Environmental Health Division (PHS- <br />EHD) "Underground Storage Tauk. Disposition Tracking Record", except dicse requiring a signature <br />and date of tank removal. The hcider of the permit shall be responsible for ersuring that this form is <br />completed and returned to PHS -EH :) within 30 days of the tank removal. <br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards <br />for this specific job site. Refer to .ihe Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of thr eity limits, submit a "Backfill Excavation Co-rtificate" as required by <br />the County of San Joaquin Building Department and the incorporated City Building Departments, pursuant <br />to the Uniform Building Code STD 70-11. <br />i [ ] 9. Obtain a "Grading and Excavation .Permit" from fhe City of Tracy Building Division prior to PHS-EHD <br />approval of the closure plan. <br />[ ] f 10. The maximum review time for Clos.ire Plans is 15 working days from receipt of the zdegdat�ly'completed <br />r" "- <br />plaii.' If gross deficiencies aie idertified, ah'addendum will be iequifed with a $87.00/9our fe 5r3`the <br />review will begin on the date of res.tbmittal. +f <br />[ ] 11. Submit verification of the fire permit from the appropriate fire district at the reaxnrJ inspection. <br />[ ] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD. <br />[ ] 13. Submit Contingency Plan for over-e.c.c avation at time of UST removal (if planning :o over -excavate). <br />See "III. SITE MITIGATION" on Page 2. <br />EH 23 046 (Revised 09/21/00) Page 1 <br />A Division q. -.;an Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.