Laserfiche WebLink
0 <br />0 <br />8. a. Describe the method that will be utilized to purge andlor inert the tanks} <br />AFTER TRIPLE RINSING, INERT WITH DRY ICEHER 1HOUbAND GALLONS OF AT THIRTY (30) LBS. ICE <br />VOLUME <br />b. TanklPlping Hauler. <br />Name WEST COAST EQUIP <br />Address BOX 2368 CltjrURLOCK.CA Z1p95381 <br />Phone No4 209 ) 668 9 <br />Hauler Registration P (If hauled as hazardous) N / A <br />C. TanklPlphtg Disposal Site: <br />SAME AS (B) ABOVE <br />Name <br />Address City Zip <br />Phone Noa 1 <br />EPA HIM (if transported to a permitted TSD facility) <br />9. Is the sampling firm an independent third party from the contractor? YESf) NO[] <br />9a. Describe, In detall. how the sell and/or water sample(s) beneath the tank and piping will be obtained: <br />PUg DANT TO FNCI nSFn rnPrFc nF sono, iwq, pp()TC406 FOR RG TIrjE TANK REMOVAL <br />10. Describe how the excavation will be backfilled with suitable material upon removal• <br />11. Handling of excavated soli <br />a) What material will be used to Una the tank pit and cover the stockpile? <br />IF REQUIRED, 4 MIL PLASTIC <br />b) What will be the final destination of the excavated stockpile? <br />REMAIN ON SITE AND USED IF ND. IF CONTAMINATION IS PRESENT, REMEDIAL <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name NOT WITHIN THE SCOPE OF THIS Hauler Registration Y_ <br />Zip <br />Phone No. <br />EH 23 046 (Revised 10119198) Page 5 <br />