Laserfiche WebLink
r� <br />SITE SPECIFIC SAFETY PLAN <br />INTRODUCTION <br />0 <br />This document describes the health and safety procedures for the <br />activities Planned in Performing THE REMOVAL OF A 1,000 GALLON UST,EST. AT <br />6_50 F..MIULR ayZ ST(ICN_C° Q5202 All personnel and <br />subcontractors will follow this plan. The prime responsibility for <br />employee safety lies with each company that is involved in the work <br />for it's own employees. It is. expressly intended that all project <br />work will comply with applicable sections of the California <br />occupational Health and safety code. All partie's working on this <br />project will maintain a general responsibility to identify and <br />correct any health and safety hazards and are responsible for working <br />in a safe manner. <br />Key Personnel <br />Project personnel who will have overall responsibility for the safe <br />operation of this are: <br />Site Contact: <br />JAMES J. BOBLITZELL & ASSOCIATES <br />Project manager and ENvIRONMENfAL CONSULTANTS <br />Bite Safety Officer GENERAL ENGINEERINOALICENSE#365234HAz <br />REGISTERED ENVIRONMENTAL ASSESSOR, REA-03121 <br />TEL (209) )43-7793 <br />FAX (209) 943-2811 P.O. Box 30331 <br />MOER.E (209)1608-2345 STocrrON, CA 95213-0331 <br />Project Manager and Safety Officer Responsibilities: <br />* To conduct initial site safety training for all project <br />field team members as described in this document, <br />* To assure all field team personnel have read and <br />understand the Health and Safety Plan, <br />* To assure that all work performed on this project is <br />conducted in a safe manner, <br />* To coordinate with f:-eld personnel fire -watch, traffic <br />control and site security, <br />