My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 3:04:48 PM
Creation date
10/4/2018 2:49:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
DSedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Chevron Station 9-5775 - 2 - 8 October 2004 <br />301 West Kettleman Lane, Lodi <br />injection, using the graphed slope of the declining contaminant(s) concentrations versus time to <br />calculate a decay rate (time to revert to non -detect). If a contaminant(s) is produced and <br />persistent, provide that information in the BSS report for my review. If contaminant(s) produced <br />are not persistent, provide that information in the BSS report and a Workplan containing <br />modifications to the Pilot Study monitoring program, specifically, the frequency of analyses <br />needed to confirm contaminant decay rates as calculated from BSS analytical evidence. During <br />the Pilot Study, groundwater sampling and analyses will be conducted, at a minimum, <br />immediately before startup of the H2O2 injection system, and at intervals of one and 2 hours <br />afterwards, in order to validate all contaminant(s) analyses and proposed decay rates, if <br />applicable. . <br />Install data loggers in monitoring wells MW -3 and MW -5B to record changes in dissolved <br />oxygen, pH, specific conductance, and temperature during the Pilot Study. -The test data will be <br />helpful to determine the effectiveness of H2O2 injection. <br />Please procure the appropriate drilling permit and give San Joaquin County Environmental Health <br />Department and myself at least 3 working days notice prior to commencement of fieldwork. <br />If you have any questions please contact me at (916) 464-4615 or bartonj(a),rb5s.swrcb.ca.gov. <br />AMES L. BARTON, R.G. <br />Engineering Geologist <br />cc: Mr. Mark Owens, State Water Resources Control Board, UST Cleanup Fund, Sacramento <br />Mr. Harlin Knoll, San Joaquin County Environmental Health Services, Stockton <br />Mr. Frank Beeler, City of Lodi Water Department, Lodi <br />Mr. David Evans, SECOR International Incorporated, Rancho Cordova <br />
The URL can be used to link to this page
Your browser does not support the video tag.