Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging/ SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has agtank <br /> ing been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Wereuging probes visually inspected for damage and residue buildup?❑ Yes ❑ No* Was f system product level readings tested? <br /> ❑ Yes ❑ No* Was f system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com let e the followingchecklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a lelinspected? <br /> ulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h g.p.h. <br /> ❑ Yes ® No* Were all LLDs confirmed operational and accurate within regulatory ents? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLcts a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any of the monitoring system is disabled <br /> ® N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any pf the monitoring system malfunctions <br /> ® N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visspected?® N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklpleted? <br /> LL <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Al R_ R7 P41-1-11e; failed test. Diesel MLLD passed. Sep P41 1 Q test data nhgFt <br /> Page 3 of 3 <br />