My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:47:10 PM
Creation date
10/4/2018 2:58:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2004-2009
FileName_PostFix
2004-2009
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Petroleum Maintenan (925) 462-4060 <br /> 176 Wyoming Street, P.O. Box 211 <br /> FAX (925) 462-8352 <br /> Pleasanton, CA 94566 <br /> VAPORLESS MANUFACTURING, INC. <br /> LDT-890 Leak Detector Test Record <br /> Contractor Customer <br /> central Petroleum Maintenance Chevron Station <br /> Location Product <br /> Date 3400 MacArthur Blvd. <br /> Tracy, CA :95377 Diesel <br /> 3/22/05 <br /> Technician <br /> GreggR. Geltz Submersible m <br /> Pup Identification <br /> Manufacturer <br /> Model No. Serial Number <br /> FE Petro v F <br /> Leak Detector Identification Other Style Leak Detector <br /> Manufacturer Description <br /> Vaporless <br /> Diaphram-Type <br /> Piston Type x <br /> Tamper-proof seal installed? Yes <br /> No X <br /> Leak Detector in Submersible Pump <br /> Test At Dispenser <br /> Retest <br /> a ara.15 1. psi (para.15) <br /> 1. Operating Pump Pressure 3 Psi (P ) <br /> 2. Gallons per hour rate <br /> 3. Z) (para.22) 2. (para. 22) <br /> 3 Line Pressure with pump shut off a,r"% psi (l3. Psi <br /> l 0 0 (para-26) 4. ml (para.26) <br /> 4. Bleedback Test with pump off ml (P ) <br /> D,-3 seconds ara.30 5. seconds(para.30) <br /> 5. Step-through time to full flow (p ) <br /> 6. Leak detector stays in leak search position (para. 42) Yes: 6. Yens:_ <br /> No: <br /> 7. Leak Detector Test: Pass: v 7. Pass:_F <br /> Fail: ail: <br /> Note. Pass=Leak Detector fits test protocal <br /> Failed= Leak Detector fails test protocal <br /> 8. Leak Detector Replaced Yes 8. Yes:_No: No: <br /> SUB - PUMP APPROXIMATE OPERATING PRESSURE <br /> Red Jacket 3/4 HP 28 PSI <br /> Red Jacket 1 1/2 HP 30 PSI <br /> Red Jacket X3 1 1/2 HP 43 PSI <br /> FE Petro 1 1/2 HP 30 PSI <br />
The URL can be used to link to this page
Your browser does not support the video tag.