Laserfiche WebLink
UNDERGROD+r.D STORAGE TANK MON-vvc'ORING PLAN <br /> For use by Undoes Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> M01 <br /> TYPE OF ACTION 0 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mm <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING I. FACELITY INFORRMATION <br /> FACILITY ID#(Agency Use Only) <br /> M03 <br /> ------------ <br /> FACa1TYNAME Tracy Petroleum, Inc. <br /> Mos. <br /> FACILITY SITE ADDRESS 3400 McArthur Blvd @ Pescadero m0°' CITY Tracy <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE M06 <br /> FStatelawequires that testing,Preventive maintenance,sortcalibration of monitoring equipment le.g.,sensors,probes,line leak detectors,etc. be perfomled in with the equipment mm�ufacturers'instructions,or a ly,whichever is more frequent Such work must be performed by qualified personnel. Moi <br /> ING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONSoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring isperformed(i.e.,location of each sensor, <br /> tector,monitoring system control panel,etc.). ifyou already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> , rdous Materials Business Plan map,etc. which shows all uired information,include it with this plan. <br /> IV. TANK MONTI'ORING <br /> MIO. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) Mit <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY N b.LIQUID FILLED ❑ a UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: Veeder Root M12' MODEL#: 30 T -A -3tb MD' <br /> LEAK SENSOR MANUFACTURER: Veeder Root Mu. MODEL#(S): mw '102 Mrs. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) Mn. <br /> PANEL MANUFACTURER: MODEL#: <br /> Mis. 'MODEL#(S): M19. <br /> IN TANK PROBE MANUFACTURER: <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS [3b.DAILY/NIGHTLY ❑ c.WEEKLY moo' <br /> ❑ d.MONTHLY ❑.e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑. b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 W4 <br /> El 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 ntzs <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> ran. <br /> TEST FREQUENCY: [Ia.ANNUALLY ❑ b.BIENNIALLY C] c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(aeau�+a avpmd) <br /> WH. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> M30. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 0 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT Mai <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: Veeder Root W1 MODEL#: 890 TL -3 To M33, <br /> Mas. <br /> LEAK SENSOR MANUFACTURER: Veeder Root Wo. MODEL#(S): 208 W5. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? 0 a.YES ❑ b.NO <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO Mn. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 gph. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS pETEqrED 1 W9 <br /> MLLD MANUFACTURER(s): _Sb as 4 Lps S Ws. MODEL#(S): L D �00(2 - <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS Mai <br /> MODEL#: <br /> ' <br /> ELLD MANUFACTURER: MooMoz. <br /> PROGRAMMED LUNE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mai. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M" <br /> ❑ 4.INTEGRITY TESTING Mas. Mm. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ S.VISUAI.MONTTORING DONE: ❑ a.DAII.YOPERATED" M47. <br /> •awimaas�rWEEKLY' <br /> a Lpvroval ..Ag�.O mC.Mo,atormg fmbmd &EACH enm{encyga�ererWrvdTIME Tpp mlyWHSC§2N1.5(b)I3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> mos. <br /> ❑ <br /> 99.OTHER(Specify) <br />