Laserfiche WebLink
S WRCB,January 2002 Page_�A_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By O Sump Manufacturer O Industry Standard X Professional Engineer <br /> O Other (Spec) <br /> Test Method Used D Pressure O Vacuum X Hydrostatic <br /> D Other (Specify) <br /> Test Equipment Used MTS Mag Probe W/TDU Meter Equipment Resolution: .001" <br /> Sump#1—91 Sump#2—87 Sump#3—Dsl <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 45" 47" 50" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 20" 19" 19" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 18" 17" 17" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good <br /> Portion of Sump Tested' 22" 21" 21" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes O No DNA X Yes O No DNA X Yes O No ❑NA O Yes ONo DNA <br /> product and water)? <br /> Turbine shutdown response time 6 Seconds 8 Seconds 5 Seconds <br /> Is system programmed for fail-safe X Yes O No [INA X Yes O No O NA X Yes O No DNA O Yes O No DNA <br /> shutdown? <br /> Was fail-safe verified to be D Yes X No DNA O Yes X No O NA O Yes X No DNA O Yes DNo [INA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 Min 10 Min 10 Min <br /> test: <br /> Test Start Time: 13:33 14:41 14:20 <br /> Initial Reading(R,): 0.000" 0.000" 0.000" 0.000" <br /> Test End Time: 13:45 14:53 14:32 <br /> Final Reading(RF): 0.000" 0.000" 0.000" <br /> Test Duration: 12 Min 12 Min 12 Min 12 Min <br /> Change in Reading(RF-R& 000" 000" 000" <br /> Pass/Fail Threshold or Criteria: +/- .002" +/- .002" +/- .002" +/- .002" <br /> Test Result: X Pass O Fail X Pass O Fail X Pass O Fail D Pass O Fail <br /> Was sensor removed for testing? X Yes DNo [INA X Yes DNo DNA X Yes DNo DNA O Yes DNo DNA <br /> Was sensor properly replaced and X Yes DNo DNA X Yes DNo DNA X Yes DNo DNA O Yes O No DNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-ap for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRC1i LG-160) <br />