My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:47:10 PM
Creation date
10/4/2018 2:58:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2004-2009
FileName_PostFix
2004-2009
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the followin checklist: <br /> iYes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes ❑ No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No` Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the folio win checklist: <br /> ❑ Yes ❑ No* For equipment start-up o annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Sim ated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed op tional and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus prope calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the L restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine utomatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine a tomatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes LY No* For electronic LLDs,does the turbine auto tically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wirin connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's aintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencie were or will be corrected. <br /> H. Comments: <br /> UN-036-3/4 Page 3 of 3 Rev.06/04/01 <br /> www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.