My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:47:10 PM
Creation date
10/4/2018 2:58:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2004-2009
FileName_PostFix
2004-2009
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK FOR TRACY PETRO INC. <br /> 1. EQUIPMENT <br /> THE EQUIPMENT FOR THIS WORK IS TO BE FURNISHED BY THE OWNER UNDER <br /> A SEPERATE AGREEMENT WITH THE SUPPLIER NORTHWEST PUMP COMPANY. <br /> THE FUEL SYSTEMS CONTRACTOR IS TO INSTALL THE EQUIPMENT PER MFGS. <br /> INSTALLATION INSTRUCTIONS AND INDUSTRY STANDARDS EXHIBITING GOOD <br /> WORKMANSHIP. <br /> 2. PHASE II EVR /ISD <br /> THIS WORK IS BEING PERFORMED TO MEET THE CURRENT REGULATIONS FOR <br /> PHASE II EVR / ISD. <br /> 3. DISPENSERS <br /> UPGRADE THE EXSTING DISPENSERS BY INSTALLING A VAPOR FLOW SENSOR <br /> IN EACH DISPENSER AND A VAPOR PRESSURE SENSOR IN THE UNIT NEAREST <br /> THE 87 TANK AND INSTALL THE PROPER HANGING HARDWARE. <br /> 4. VEEDER-ROOT CANISTER <br /> INSTALL VEEDER-ROOT CANISTER MODLE NO. 861290-002 PER MFG. <br /> INSTALLATION INSTRUCTIONS, IN ACCORDANCE WITH CSFM AND CARB <br /> CERTIFICATIONS. THE LOCATION SHALL BE THE PRIMARY 87 GASOLINE TANK <br /> 2" VENT RISER, AT THE LOCATION SHOWN ON THE WORK PLAN DWG. F-1 <br /> DATED 1/26/2009. <br /> 5. MONITOR PANEL <br /> UPGRADE TO THE EXISTING VEEDER-ROOT PANEL 350 FOR ISD. <br /> 6. TESTING <br /> PROVIDE ALL TESTING AND START UP REQUIRED BY THE EQUIPMENT MFG. <br /> AND THE PERMITS ISSUED FOR THE WORK. THE FUEL SYSTEMS CONTRACTOR <br /> MAY NOT BE PERFORMING ALL OF THE TESTING AND THE START UP. THIS <br /> SERVICE MAY BE PERFORMED BY OTHERS WORKING DIRECTLY FOR THE <br /> OWNER. <br /> 7. PERMITS <br /> FUEL SYSTEMS CONSULTING WILL MAKE APPLICATION FOR A PERMIT FROM <br /> SJVAQMD "AIR", SJCHSD "HAZ", AND TRACY FIRE DEPT. "FIRE". <br /> WE EXCLUDE PERMITS OTHER THAN THOSE DETAILED ABOVE. <br /> 09283scopel <br />
The URL can be used to link to this page
Your browser does not support the video tag.