My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:47:10 PM
Creation date
10/4/2018 2:58:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2004-2009
FileName_PostFix
2004-2009
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L' COMPANY: TRACYPETRO INC.DBA MACARTHUR CHEVRON#212470 DATE OF QUOTATION QUOTE NUMBER <br /> PROJECT VeederRoot EVR/ISD 12/05/08 AG637-08.02 <br /> QUANTITY DESCRIPTION UNIT PRICE EXTENDED <br /> DISPENSER HARDWARE: <br /> 8 VST VSTA-EVR-012 12"Coaxial EVR Whip Hose <br /> 8 VST VDV-EVR-096 8'Coaxial EVR Hose With Venturi <br /> 8 VST VSTA-EVR-SBK Coaxial EVR Breakaway With Check Valve <br /> 8 VST VST-EVR-NBBL Coaxial EVR Balance Nozzle Black <br /> VEEDER ROOT Carbon Canister for ISD <br /> 1 VEEDER-ROOT 861290-002 Carbon Pressure Management System(Pending CARB <br /> Approval)W/2"Installation Kit <br /> 1 HUSKY 5885 2"Pressure Vacuum Vent(EVR Carb Approved) <br /> Veeder Root Canister/ISD Components[VST Hanging Hardware Terms: 25% <br /> down payment required and balance due 10 days after invoice which will be <br /> upon receipt of Canisters by NWP from Veeder Root. <br /> 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module <br /> 4 VEEDER-ROOT 330020-585 Balance VST Vapor Flow Sensor- 1 per disp required <br /> 1 VEEDER-ROOT 330020-515 ISD Manuals&Vapor Pressure Sensor-1 per site <br /> 1 VEEDER-ROOT 330404-020 Wayne Nucleu/Ruby/Sapphire Dispenser Interface Modu <br /> 1 VEEDER-ROOT 848722-100 Wayne Nucleu/Ruby/Sapphire 100'Cable to TLS350& I <br /> 1 VEEDER-ROOT 330586-001 Dual RS-232 Interface Module <br /> 1 VEEDER-ROOT 332250-001 7 Input Smart Sensor Module W Embedded Pressure <br /> Sensor For Vacuum Sensor Monitoring&ISD For VR Carbon Canister.One spot <br /> required for the Vapor Pressure Sensor and one for each Vapor Flow Sensor. Mounts <br /> in Low Power Compartment. <br /> 1 VEEDER-ROOT 331500-358 ECPU2&Version 28 Software Upgrade W/NVMEM2 <br /> Old ECPU Board Must Be Returned within 75 Days.There is a minimum$1192.94 <br /> Core Charge. Core charge will be considerably higher if the current software has any <br /> software enhancements on it such as CSLD, PLLD etc. <br /> Page 2 of 2 <br /> Northwest Pump Equipment Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.