Laserfiche WebLink
i <br />SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: — -� <br />Technician: l�r / <br />f-, <br />Site Engineer: Bob Jackson <br />PART A: GENERAL INFORMATION <br />�I <br />Time of Arrival: / %..y0 <br />Time of Departure: :3;.` <br />Time Site Engineer was contacted from field? / -2—/� <br />r PART B: SVE SYSTEM DATA <br />System up or down upon arrival: <br />Hourmeter Reading: —>/ At time: I Jl <br />k.+ <br />r <br />(If down please complete PART E) <br />u!. --:-I,LS <br />A <br />Site Location: Chevron 9-5775, 301 West Kettleman Lane, Lodi, CA <br />Project No. 77CH.95775.02.0550 <br />r 7 <br />Abatement Equip.: Falmouth Products Faaco 100 Catalytic Oxidizer <br />Serial No.: <br />C <br />Current reading minus previous reading <br />SVE Blower:_ 5 hp motor, 15.5 Amp_ _ <br />AMP Reading: <br />` <br />2r <br />Telemetry: Sonitrol <br />MAX AMP Rating: <br />% Operability <br />f%Q <br />Electrical Power: 230 V 3 phase -- 200 amp <br />a <br />Elect. Meter Reading: <br />s <br />Supplemental Fuel: None <br />No. of K/O barrels at site: '99L _Full <br />Empty <br />r PART B: SVE SYSTEM DATA <br />System up or down upon arrival: <br />Hourmeter Reading: —>/ At time: I Jl <br />k.+ <br />r <br />(If down please complete PART E) <br />u!. --:-I,LS <br />A <br />Previous hourmeter reading <br />B <br />Current hourmeter reading'l� <br />g <br />C <br />Current reading minus previous reading <br />D <br />Total hours since last O&M event�S <br />2r <br />E <br />C / D X 100 <br />% Operability <br />f%Q <br />szcpursFCILVrss upe+zwuuy sv rise eagmeerprsarsu seuvsng aue <br />3 <br />