Laserfiche WebLink
S E C O R <br />Fourth Quarter 2002, Quarterly Progress Report <br />January 14, 2003 <br />Page 2 <br />2.0 EVALUATION OF GROUNDWATER EXTRACTION AND SOIL VAPOR EXTRACTION <br />SYSTEMS <br />2.1 Introduction <br />GWE and SVE systems were initiated on July 3, 2000. A brief description and performance evaluation of <br />the remedial systems during 4Q02 are presented below. Certified analytical reports and chain -of -custody <br />documentation and remedial system operation and maintenance field data sheets are included in <br />Attachments D and E, respectively. <br />2.2 Groundwater Extraction System <br />The GWE system consists of groundwater extraction wells EX -1, EX -2 and EX -3 (Figure 5). These wells <br />are equipped with submersible pumps connected through mechanical piping to a series of granular <br />activated carbon (GAC) vessels prior to an industrial sewer discharge point. Chevron discharges treated <br />groundwater at the subject site under City of Lodi wastewater discharge permit #310. <br />To assess effectiveness of the GWE system, process samples were collected bimonthly during this <br />reporting period. Sample locations include a influent port (INFL), prior to the first GAC vessel, between <br />the first and second GAC vessels (MID -1), between the second and third GAC vessels (MID -2), and prior <br />to discharge (EFFL) to the industrial sewer. During these sampling events, INFL, MID -1, MID -2 and EFFL <br />samples were analyzed for TPHg, BTEX, MtBE, TBA, DIPE, EtBE, TAME, ethanol, methanol, EDB and <br />1,2 -DCA. Maximum concentrations of detected constituents are presented below. Current and historical <br />analytical information is presented as Table 3. <br />Between September 24 and December 17, 2002, the GWE system discharged a total of 1,255,970 <br />gallons of treated groundwater over a period of 85 days (Table 4). As of December 17, 2002, the GWE <br />system has treated a total of 5,318,694 gallons. Calculated discharge rates during the 4002 monitoring <br />period ranged from 5.64 to 10.34 gallons per minute (gpm). <br />During 4002 the system extracted an estimated 0.3 pounds of TPHg and 0.3 pounds of MtBE. To date, <br />the system has extracted approximately 8.3 pounds of TPHg, 0.2 pounds of benzene, and 84.6 pounds of <br />MtBE. Plots of GWE system mass removal trends and influent groundwater TPHg, benzene, and MtBE <br />concentrations versus time are shown on Figure 6 and 7, respectively. <br />