Laserfiche WebLink
C" <br />k . <br />9-5775 <br />- SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: Time of Arrival: <br />Technician: 7 <br />Time of Departure: % - .�� <br />Site Engineer: Karam Parmar Time Site Engineer was contacted from field? <br />PART A: GENERAL INFORMATION <br />_ Site Location: Chevron 9.5775 301 West Kettleman Lane Lodi CA Project No. 77CH.95775.02.0550 <br />i Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer Serial No.: <br />SVE Blower: 5 hp motor, 15.5 AmpAMP Reading: <br />Telemetry: Sonitrol MAX AMP Rating; <br />F <br />Electrical Power: 230 V 3 Dhase — 200 am <br />Supplemental Fuel: None <br />No. of KtO barrels at site: Ful[ Empty <br />PART B: SVE SYSTEM DATA <br />Elect. Meter Reading: <br />System up or down upon arrival: (if down please complete PART E) <br />Hourmeter Reading: Z�-.;?-..� At time: <br />A <br />Previous hourmeter reading <br />B <br />Current hourrneter reading <br />C <br />Current reading minus previous reading <br />Total hours since last O&M event <br />D <br />E <br />C / D X 100 % Operability <br />epo percent operaDally to site eng neer p or o earring site <br />I:1Chevron195775+ield Services Requesl%O&MDATA Sheet,doc <br />