Laserfiche WebLink
I: CLE&\`UP AND ABATEMENT ORDER NO. 5-00-704 '4 <br />FORMER CHEVRON STATION #9-5775 <br />301 WEST KETTLEMAN LANE <br />LODI. SAN JOAQUIN COUNTY <br />Site -Specific Investigation And Cleanup Tasks (continued) Compliance Date <br />3. Install and continuously operate a soil vapor extraction system, and an 3 July 2000 <br />interim pump and treat system in the area of the highest soil and <br />groundwater MtBE contamination. The interim pump and treat <br />system must stabilize the groundiâ–º-ater plume to prevent movement <br />of ARBE toii-ard City Well 12. <br />-. 4. Submit a complete Problem Assessment Report (PAR) acceptable to the 24 July 2000 <br />o , Board and County staff as described in Appendix A of the Tri -Regional <br />Recommendations. The PAR must include requirernents for any <br />7. discharge permit(s) required and a time line for submittal of Report(s) of <br />I , Waste Discharge. <br />5. Within 15 days of Board staff approval of the Problam Assessment 28 August 2000 <br />Report, but no later than 28 August 2000, submit a Final Remediation <br />Plan (described in Appendix A) for the cleanup of the soil and <br />groundwater at the site. <br />6. Within 30 days of Board staff approval of the selects Remedial Option, 6 October 2000 <br />but no later than 6 October 2000, implement and continuously operate, <br />the approved remediation system, with the exception of periodic and <br />scheduled maintenance. Any interruption in the operation of the <br />cleanup system(s), other than for scheduled maintenance, without prior <br />approval of the Executive Officer, is a violation of this Order. <br />Reporting and Permits <br />7. ?Notify the Board and County staff at least two business days prior to any site work or sampling. <br />8 Obtain all necessary local and state permits prior to beginning Work- <br />9. <br />ork9. Submit all reports and correspondence to the Board's Sacramento Office, the San Joaquin <br />County Environmental Health Division, and all patties (or representatives) identified in this <br />Order. Under penalty of perjury, the technical reporrs as directed, which shall be submitted to the <br />Executive Officer of the Board, and to the County, must be signed by an appropriately licensed <br />Fr professional. (technical reports and plans, including drilling logs and soil and groundwater <br />sampling, are to be prepared, signed, and certified by a Registered Geologist, Registered Civil <br />Engineer, Certified Engineering Geologist, or Certified Hydrogeologi:st). All registered <br />professionals must be licensed by the State of California. <br />10. Submit preapprovals with workplan and all reports x% ith reimbursement requests to the State <br />Water Resources Control Board Cleanup Fund in a timely manner to avoid delays that would <br />result in non-compliance with this Order. <br />r. <br />