Laserfiche WebLink
pro ect-1//��n <br />e of Technicians c- <br />_val Time: 7:'c�:20 Depa <br />Weather Notations: N' <br />GUAGE WELLS <br />BAIL SEPARATE --PHASE <br />SAMPLE AIS INF EFF <br />SYSTEM CHECK <br />SAMPLE WELLS <br />SITE VISITATION REPORT <br />Date:�s Project No.: 77c-:IA1- <br />Did you call in? Yes N <br />_ �� >S Who did you call? <br />_OUDY RAIN SNOW Temperature: F <br />PURPOSE OF VISIT <br />SURVEY INSTALL EQUIPMENT <br />MONITOR VAPORS INSTALL SYSTEM <br />SAMPLE CARBON OTHER: y �- y, ,�•� <br />BATCH FEEDt'�U, i <br />Y <br />EQUIPMENT REPAIR <br />DRUM INVENTORY <br />WATER CARBON TOTAL OPEN TOP <br />SOIL EMPTY TOTAL BUNG TOP <br />SAMPLE INFORMATION <br />SAMPLED: YES NO PARAMETERS: <br />LABORATORY: <br />WATER SOIL CHAIN OF CUSTODY NO: <br />AIR OTHER <br />Y <br />REMEDIATION SYSTEM <br />FLOW TOTALIZER: AIR VELOCITY <br />FLOW CRATE: PED INF: <br />S LJ=_L_ PID EFF. <br />DESCRIPTION OF ACTIVITIES ON SITE AND NOTES <br />