Laserfiche WebLink
SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />0 <br />Date //7)4-3 <br />s- <br />Techrocian <br />' Site Engineer C�Uyi �ctc-� S�z <br />PART A GENERAL INFORMATION <br />1 <br />� I <br />Time of Arrival <br />Time of Departure <br />425 <br />Time Site Engineer was contacted from field'? <br />Site Location Chevron 9 5775, 301 West Kettleman Lane, Lodi, CA <br />Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower 5 hp motor, 15 5 Amp <br />Telemetry Sonitrol <br />Electrical Power 230 V 3 phase — 200 amo <br />Supplemental Fuel None <br />No of K/O barrels at site �6 '2� Full Empty <br />PART B SVE SYSTEM DATA <br />� I* <br />� I <br />I I <br />1 <br />I I <br />I I <br />I I <br />� I <br />Project No 77CH 95775 00 0550 <br />Serial No <br />Max AMP Rating s <br />MAX AMP Rating <br />Elect Meter Reading <br />System up or down upon arrival System shut down 4002 (If down please complete PART E) <br />Hourmeter Reading �- �� At time <br />A <br />Previous hourmeter reading <br />192966 B 10 57 <br />B <br />Current hourmeter reading <br />%~ l <br />C <br />Current reading minus previous reading <br />r� <br />D <br />Total hours since last O&M event <br />f� /� ✓r { �S' <br />E <br />C / D X 100 <br />% Operability <br />ctepvrr perceac vperuauuy av sue erigrrreer Uftur ry reuruig auc <br />