Laserfiche WebLink
SVE/GWE SYSTEM <br />9 FIELD MONITORING DATA SHEETS <br />Date -iW4��_7:2- Q 3 Time of Arrival f G� <br />Technician Steve Thompson Time of Departure <br />Site Engineer Bob Jackson Time Site Engineer was contacted from field? AvG <br />PART A GENERAL INFORMATION <br />Site Location _ Chevron 9-5775, 301 West Kettleman Lane Lodi, CA <br />Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower 5_hp motor, 15 5 Amp <br />Telemetry <br />Project No 77CH 95775 00 0550 <br />Serial No <br />AMP Reading /--•-5-7 <br />MAX AMP Rating <br />Electrical Power 230 V 3 phase - 200 amp _ 77 <br />Elect Meter Reading <br />Supplemental Fuel None <br />No of K!O barrels at site Full Empty <br />PART B SVE SYSTEM DATA <br />System up or down upon arrival (if down please complete PART E) <br />Houmteter Reading �-- At time <br />0 <br />• <br />A <br />Previous hourmeter reading <br />192966 <br />0 10 57 <br />B <br />Current hourmeter reading <br />X57 <br />C <br />Current reading minus previous reading <br />D <br />Total hours since last O&M event <br />E <br />C / D X 100 <br />% Operability <br />-- 21 p. , —'.. -I.. -s "".y w a"V crag,"Mur prwr W ceuytng sue <br />