My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003037
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:55:31 AM
Creation date
10/9/2018 3:49:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003037
FileName_PostFix
XR0003037
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company <br />Former Chevron Service Station #9-5775, 301 West Kettleman Lane, Lodi, California <br />• <br />I IChevron1957751ParFrpl9-5775PARFRP2 doe <br />it <br />June 5, 200I <br />5.1 1 GWE System Radius of Influence <br />13 <br />•52 <br />SVE System Operation <br />13 <br />5 2 1 SVE System Radius of Influence <br />14 <br />6.0 EVALUATION OF REMEDIAL ALTERNATIVES <br />14 <br />6.1 Over -excavation <br />14 <br />62 Sensitive Receptor Removal <br />14 <br />6 2 1 Abandon and Replace Well 12 <br />15 <br />6 2 2 Well Head Treatment <br />15 <br />6 2 3 Removal From Active Service <br />15 <br />63 Enhanced Groundwater Extraction <br />15 <br />63 1 Angled Extraction Well <br />16 <br />6 3 2 Extraction Wells South of Kettleman Lane <br />16 <br />7.0 PROPOSED SCOPE OF WORK AND SCHEDULE <br />FOR COMPLETION <br />17 <br />71 Scope of Work <br />17 <br />71 1 GWE Well Installation <br />18 <br />7 12 Extraction Well Pipmg <br />18 <br />72 Schedule <br />18 <br />8.0 CONCLUSIONS AND RECOMMENDATIONS <br />18 <br />• <br />I IChevron1957751ParFrpl9-5775PARFRP2 doe <br />it <br />June 5, 200I <br />
The URL can be used to link to this page
Your browser does not support the video tag.