My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003040
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:56:18 AM
Creation date
10/9/2018 4:12:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003040
FileName_PostFix
XR0003040
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company <br />Farmer Chevron Service Station #9-5775, 301 West Kettleman Lane, Lodi, California <br />0 List of Tables <br />• <br />April 15,2002 <br />Table 1 <br />Groundwater Gauging Data <br />Table 2 <br />Groundwater Analytical Results <br />Table 3 <br />Groundwater Extraction System Analytical Data <br />Table 4 <br />Groundwater Extraction System Performance Data <br />Table 5 <br />Soil Vapor Extraction System Mass Removal Data <br />Table 5.1 <br />Soil Vapor Extraction System MtBE Mass Removal Data <br />Table 6 <br />Soil Vapor Extraction System Emission Data <br />Attachment F <br />List of Figures <br />Figure 1 <br />Site Location Map <br />Figure 2 <br />A -Zone Groundwater Elevation Contour Map <br />Figure 3 <br />B -Zone Groundwater Elevation Contour Map <br />Figure 4 <br />A -Zone MtBE Isoconcentration Contour Map <br />Figure 5 <br />Remediation System Site Plan <br />Figure 6 <br />Cumulative Groundwater Extraction Constituent Mass Removal <br />Figure 7 <br />Groundwater Extraction Influent Constituent Concentrations <br />Figure 8 <br />Cumulative Soil Vapor Extraction Constituent Removal <br />Figure 9 <br />Soil Vapor Extraction Influent Constituent Concentrations <br />List of Appendices <br />Attachment A <br />Cleanup and Abatement Order No. 5-00-704, dated April 20, 2000, <br />Attachment B <br />Monitoring and Sampling Field and Laboratory Procedures <br />Attachment C <br />Monitoring and Sampling Certified Analytical Reports, and Chain -of - <br />Custody Record <br />Attachment D <br />Monitoring and Sampling Field Data Sheets <br />Attachment E <br />Operation and Maintenance Certified Analytical Reports, and Chain - <br />of -Custody Record <br />Attachment F <br />Operation and Maintenance Field Data Sheets <br />Attachment G <br />Review Fourth Quarter 2001 Progress Report and Final Remediation <br />Plan Addendum, dated March 13, 2002 <br />1:IChevron19577"eriodic Monitoring\Quarterly Progress Reports1200211st Quarter -2002 .Progress Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.