Laserfiche WebLink
11 <br />0 <br />10/10/00 TUE 17:09 FAX 1 918 861 0430 SECOR-SACRAMENTO 1& 010 <br />October 9, 2000 <br />Project 077.41991.043 <br />Mr. Marty Hartzell <br />Regional Water Quality Control Board <br />(RWQCB) — Central Valley District <br />3443 Routier Road, Suite A <br />Sacramento, California 95827-3098 <br />~ V L r� <br />r <br />M <br />4zyCOR <br />International ,Incorporated <br />Mr, Harlin Knoll <br />San Joaquin County Environmental Health <br />Division (SJCEHD) <br />304 East Webber Avenue, Third Floor <br />Stockton, California 95201-0388 <br />Re: Response to RWQCB Letter, dated <br />September 22, 2000 <br />Former Chevron #9-5775 <br />301 West Kettleman Vane <br />Lodi, California <br />Cleanup and Abatement Order No. 5-00-704 <br />Dear Mr. Hartzell and Mr. Knoll: <br />SECOR International Incorporated (SECOR), on behalf of Chevron Products Company <br />(Chevron), has prepared this letter in response to the Notice of Violation (NOV) issued <br />by the California Regional Water Quality Control Board — Central Valley Region <br />(RWQCB), dated September 22, 2000 for the subject site. Although this letter responds <br />to general comments made by the RWQCB, it specifically addresses actions completed <br />to stabilize the groundwater plume at the site reference above as requested in item <br />number 1 of 3 in the NOV. A copy of the NOV is included as Attachment A. <br />The NOV also requested that a work plan be submitted to respond to item number 2 of <br />the NOV. A work plan has been prepared and will be submitted under separate cover to <br />address item number 2. It should be noted that in convcrsation with Mr. Hmuell on <br />September 29, 2000, the deadline stated in the NOV for item 1 (this letter) and item 2 <br />(work plan) of October 9, 2000 was by extended by Mr. Hartzell to October 10, 2000, <br />due to the Columbus Day Holiday on October 9, 2000 - <br />Further, the NOV requires that a "complete Problem Assessment Report/Final <br />Remediation Plan" be submitted by December 4, 2000. A document addressing item <br />number 3 will be prepared and submitted under separate cover. <br />The following comments in bold italics were included in the RWQCB's September 22, <br />2000 letter. A response follows each comment below. <br />C&A Order No. 3 requires you to "Install and continuously operate a soil vapor <br />extraction system, and an interim pump and treat system in the area of the highest <br />soil and groundwater MtEE contamination. The interim pump and system must <br />yit- A741[jrr Rwid. SW(c /00- 1 ttt fn'bn cw-elrua. C-1 956. /1 {)ICi h'h/,!1}f1U Nlf�,.ti(�l.(li.fif� Frr.t" Orfru•.iVOWA0011 <br />