Laserfiche WebLink
r3 l <br />Chevron Products Company 7 <br />Former Chevron Station #9-57 30l West Kettlaman Lane Lodi California October 4 2 00 <br />:7 <br />16 <br />• Report. A report will be prepared after completion of necessary field <br />work and upon receipt of all laboratory analytical results. The report <br />will include boring logs and well construction details, site map, soil and <br />groundwater analytical results, chain -of -custody documentation, and <br />findings. <br />Field and laboratory procedures are presented as Attachment E. <br />SCHEDULE <br />SECOR is prepared to initiate field work within 2 weeks following the issuance of <br />necessary permits by the SJCEHD, California Department of Transportation (CalTrans), <br />and the securing of access for the offsite locations. Due to the extreme time <br />constraint imposed by the NOV, we will assume that full RWQCB approval of our <br />proposed scope of work is given if we do not receive a response from RWQCB <br />within 5 days. An addendum to the Problem Assessment Report (PAR)/Final <br />Remediation Plan (FRP) documenting the findings of the investigation will be <br />submitted on or before December 4, 2000. <br />If you have any questions or comments regarding this work plan, please feel free to call <br />us at (916) 861-0400. <br />Sincerely, <br />SECOR International Incorporated <br />0id M. Evans <br />Staff Scientist /AEC <br />%f Q` GREG <br />BARCLAY <br />Greg Barclay, R.G. Na. 62 <br />Senior Geologist qr pQ`� <br />OF CALF <br />W <br />r/Roger Hoffmore <br />Project Geologist <br />077.41991.04319-5775 WP 100900.doc <br />