My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003045
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:57:45 AM
Creation date
10/9/2018 4:34:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003045
FileName_PostFix
XR0003045
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sECOR <br />,* International Incorporated <br />August 25, 2000 <br />Project 077 41991 043 <br />• <br />Mr Harlin Knoll Mr Marty Hartzell <br />San Joaquin County Environmental Health Regional Water Quality Control Board — <br />Division Central Valley District <br />304 East Webber Avenue, Third Floor 3443 Routier Road, Suite A <br />Stockton, California 95201-0388 Sacramento, California 95827-3098 <br />Re Final Remediation Plan <br />Former Chevron #9-5775 <br />301 West Kettleman Lane <br />Lodi, California <br />Cleanup and Abatement Order No 5-00-704 <br />Dear Mr Knoll and Mr Hartzell <br />SECOR International Incorporated (SECOR) has prepared this Final Remediation Plan <br />(FRP) on behalf of Chevron Products Company (Chevron) for the site reference above <br />(Figures 1 and 2) This FRP includes the following intormation <br />• Site Background, <br />• Summary of Interim Remediation, <br />• Site Geology and Hydrogeology, <br />• Hydrocarbon Primary and Secondary Sources, <br />• Summary of Remedial Feasibility Testing, <br />• Remedial Objectives and Recommended Remedial Alternative, <br />• Implementation Process, and <br />• Proposed Schedule <br />The purpose of this FRP is to provide a framework for remediation, considering <br />pertinent regulatory guidance, site conditions, and site remediation constraints This <br />FRP was prepared in accordance with Cleanup and Abatement Order (CAO) No 5-00- <br />704, dated April 20, 2000 A copy of the CAO is included as Attachment A <br />3077 Kilgore Roach ' uzie 100, Rancho Corclot a, CA 95670 916 861 0400 916 861 0430 Fax www %ecor coni <br />
The URL can be used to link to this page
Your browser does not support the video tag.