Laserfiche WebLink
• <br />SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: <br />Technician: Steve Thompson <br />Site Engineer: David M. Evans <br />PART A: GENERAL INFORMATION <br />Time of Arrival: <br />Time of Departure: <br />Was Site Engineer contacted from field? Yes 13` <br />&le Location: Chevron 95775 301 West Kettleman Lane Lodi CA <br />Abatement Equi p-: Falmouth Products Falco 100 Cataf is Oxidizer Project No. 077.43452 .550 <br />SVE Blower: 5 h motor. 15.5 Am Serial No.: <br />Max AMP Rating: <br />Telemetry: fJvt , ✓`11 � ' <br />MAX AMP Rating: <br />Electrical Power: 230 V 3 phase —200 am <br />Supplemental Fuel: None Elect. Meter Reading: <br />No. of K!O barrels at site: _ <br />Full Empty <br />PART B: SVE SYSTEM DATA <br />System up or down upon arrival: <br />(if down please complete PART E) <br />0 Hourmeter Reading: _ <br />At time: • � � <br />IQ <br />/Z) <br />Vacuum ® blower (in H2O) <br />ITS System Flow (A P, In H20) <br />Pipe size - <br />Well Field Air Flow (e P, in H2O) <br />POe Size 4" <br />Dilution Air Flow (D P. "H2O) <br />