Laserfiche WebLink
S SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />tate:v ! Time of Arrival: -q5 <br />Technician: Steve Thompson Time of Departure: <br />Site Engineer: David M Evans Was Site Engineer contacted from field? Yes y�No <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 95775, 301 West Kettleman Lane, Lodi, CA Project No. 077.43452.550 <br />Abatement Equip,� Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower: 5 hp motor. 15.5, Ami <br />Telemetry: _ 5�AH, <br />Electrical Power. 230 V 3 phase - 200 amp <br />Supplemental Fuel: None <br />No. of K/O barrels at site: Full Empty <br />PART S: SVE SYSTEM DATA <br />1) <br />to <br />0 <br />Serial No.: <br />Max AMP Rating: %S <br />MAX AMP Rating: <br />Elect. Meter Reading: <br />System up or down upon arrival: !l/ _ (If down please complete PART E) <br />�L <br />Hounneter Reading: � � � ! �� At time: <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve <br />r <br />l) <br />�2— <br />% Reciralation valve open <br />fV0 content (00 <br />Vacua 0 M wer (in H2O) <br />Gauge Range <br />.. <br />i <br />AMPS drawn by blower motor AMPS <br />Total System Flow (A P, in H2O) <br />Size #' <br />--Pipe <br />Well Field Air Flow (A P, in H2O) <br />Pipe Size # 4' <br />Dilution Air Flow (A P, 'H2O) <br />Pipe Size ' <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Difference <br />Sp tem Influent fore dilution <br />�2— <br />S tem Influent after dilution <br />5 tem Effluent <br />Field Instrument Used: Last Calibrated: -7 L, of <br />