Laserfiche WebLink
SVE/GWE SYSTEM <br />is FIELD MONITORING DATA SHEETS <br />Date: Q� Time of Arrival: J 2 - ,7?Z <br />Technician: Steve Thompson Time of Departure: _Z- %S <br />Site Engineer: pavid M Evans Was Site Engineer contacted from field? Yes l_No <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 95775 301 West Kettleman Lane Lodi CA Project No. 077.43452.550 <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower: 5 hp motor. 15.5 Ami <br />Telemetry: <br />Electrical Power: 230 V 3 phase - 200 am <br />Supplemental Fuel: None <br />No. of WO barrels at site: Full Empty <br />PART 1B: SVE SYSTEM DATA <br />11) <br />0 <br />System up or down upon arrival: <br />[� <br />Hourmeler Reading: <br />Serial No.: <br />Max AMP Rating: <br />MAX AMP Rating: <br />Elect. Meter Reading: <br />(If down please complete PART E) <br />At time: /& <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve open <br />3 <br />vZds <br />% Recirculation valve open <br />1Q <br />WO Content al <br />t <br />Vacuum Q blower (in H2O) <br />Gauge Range <br />LJ i r e <br />(,r <br />AMPS drawn by blower motor AMPS <br />l <br />total Syslem Flaw (e P, in H20) <br />f 7 <br />Q <br />Well Field Air Flow (A P, in H2O) <br />Pive.Size4i.4" <br />Dilution Air Flow (A P. "H2O) <br />Pipe Size 4' <br />FID Data <br />W/ Carbon <br />W/O carbon <br />Difference <br />System Influent my before dilution <br />3 <br />vZds <br />System Influent my after dilution <br />System Effluent my <br />�7 <br />y� <br />t <br />Feld Instrument Used: It:510 Last Calibrated: B/ <br />