Laserfiche WebLink
• SVEJGWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: -� �7e�/ <br />Technician: Steve Thompson <br />Site Engineer. David M. Evans <br />PART A: GENERAL INFORMATION <br />Time of Arrival: Z' �d <br />Time of Departure: G,3Z) <br />Was Site Engineer contacted from field? Yes No <br />Site Location: Chevron 95775 301 West Kettleman Lane Lodi CA Project No. 077.43452.550 <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer Serial No.: <br />SVE Blower: 5 h motor, <br />,-15.51Am Max AMP Rating: <br />Telemetry: mor*. I r I MAX AMP Rating: <br />Electrical Power: 230 V 3 hale — 200 am <br />Supplemental Fuel: None <br />No. of K/O barrels at site: Ful Empty <br />PART B: SVE SYSTEM DATA <br />i <br />i) <br />11) <br />0 <br />ElecL Meter Reading:�� <br />System up or down upon arrival !� (If down please complete PART E) <br />Hourmeter Reading: At time: <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve open <br />% Recirculation valve open <br />K/O Content I <br />Vacuum @ blower (in H2O) <br />Gauge Ran <br />AMPS drawn by blower motor AMPS <br />�Y <br />f 2S <br />Total System Flow (A P, In H2O) <br />PiDO Size 16- <br />�'3 •�9 <br />p p <br />! 3 �/ <br />Well Field Air Flow (A P, in H2O) <br />PiDe Size ib 4' <br />Dilution Air Flow (A P. 'H2O) <br />Pi Size <br />