Laserfiche WebLink
SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: b Time of Arrival: <br />Technician: Steve Thompson Time of Departure: l <br />Site Engineer: David M. Evans Was Site Engineer contacted from field? Yes _ k No <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 95775, 301 West Kettleman Lane, Lodi, CA Project No. 077,43452.550 <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer <br />SVE Blower: 5 hp motor, 15.5 Amp <br />Telemetry: ST �r, `f�22 / <br />Electrical Power: 230 V 3 phase - 200 amp <br />Supplemental Fuel: None /� <br />� <br />No. of WO barrels at site: _ 5(� Full Empty <br />PART 8: SVE SYSTEM DATA <br />• <br />I) <br />li) <br />9 <br />Serial No.: <br />Max AMP Rating: <br />MAX AMP Rating: <br />Elect. Meter Reading. 2i3 <br />System up or down upon arrival: !" - (If down please complete PART E) <br />Hourmeter Reading: At time: <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve o <br />��j� <br />/ <br />�0s cp D <br />% Recirculation valve openD <br />j a <br />K/O Content <br />o J5 <br />Vacuum 0 blower (in H2O) <br />Ga <br />-7" <br />AMPS drawn by blower motorAMPSp <br />y <br />Teta! System Flow (A P, in H2O)pip <br />J t / • Zai <br />.S7• <br />Well Field Air Flow ( A P. in H2O) <br />Pipe Size 4" <br />Dilution Ah Flow (A P, `H2O) <br />Pipe Size <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Difference <br />System Influent difutim) <br />System Influent after dilution) <br />System Effluent <br />Field Instrument Used: Y / Last Calibrated: 6LI Q t <br />