Laserfiche WebLink
FIELD SERVICES REQUEST <br />TE INFORMATION FORM,�1� <br />Identification <br />Project #: 077-43452,550 <br />Station ID #: Chevron 95775 <br />Site Address: 301 West Keffleman Lane <br />Lodi, CA <br />Lab: Kiff Analytical <br />County: San Joaquin <br />Project Manager: Ron Chinn <br />Requester: David M. Evans <br />Client: Chevron Products Cam an <br />Client P.O.C: Bob Cochran <br />Date of Request: 20 -Feb -2001 <br />Field Tasks General Description <br />Proiect Type <br />Q Operation & Maintenance <br />El Sampling <br />r] 1st Time Visit <br />Quarterly <br />T 1st 2nd 3rd 4th <br />F] Monthly <br />Semi -Monthly <br />Q Weekly <br />One Time Event <br />Other: <br />Field Date: Wednesdays at 10 am <br />1) Sample SVE system (bag samples) according to the following schedule <br />• <br />Take bag samples on even dated Wednesdays <br />2) Sample GWE system (water samples) according to the following schedule <br />Check Appropriate_ Category <br />Budget Site Visit <br />Out of Budget Site Visit <br />Budget Hours: 4/6 <br />Actual Hours: <br />Mob/de Mob: 2 <br />Site Safety Concerns <br />See Health and Safety Plan <br />Analyze samples by 8260 for oxygenates TEA, MtBE, DIPS, TAME, EtBE, ethanol, methanol, 1,2 -DCA, EDB_ <br />M = Monthly <br />Q = Quarterly, Quarterly samples = Jan, April, July, Nov. <br />S) Call site engineer before leaving site. _ <br />Completed By: �CpcJG Date: SECOR <br />-- Intoffmwond InaoWalso <br />0k:V-omUV-9M b0MCO Meque 30$ <br />2x per Month <br />2x per Month <br />rTPHg/BTEX/MtBE <br />FID <br />2x per Month <br />2x per Month <br />Take bag samples on even dated Wednesdays <br />2) Sample GWE system (water samples) according to the following schedule <br />Check Appropriate_ Category <br />Budget Site Visit <br />Out of Budget Site Visit <br />Budget Hours: 4/6 <br />Actual Hours: <br />Mob/de Mob: 2 <br />Site Safety Concerns <br />See Health and Safety Plan <br />Analyze samples by 8260 for oxygenates TEA, MtBE, DIPS, TAME, EtBE, ethanol, methanol, 1,2 -DCA, EDB_ <br />M = Monthly <br />Q = Quarterly, Quarterly samples = Jan, April, July, Nov. <br />S) Call site engineer before leaving site. _ <br />Completed By: �CpcJG Date: SECOR <br />-- Intoffmwond InaoWalso <br />0k:V-omUV-9M b0MCO Meque 30$ <br />