Laserfiche WebLink
SVE/GWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Date: <br />� / ��� Time of Arrival: <br />Technician: Steve Thom son Time of Departure:y �� <br />Site Engineer: David M. Evans Was Site Engineer contacted from field? Yes __No_,,-'< <br />PART A: GENERAL INFORMATION <br />Site Location: Chevron 95775, 301 West Kettleman Lane, Lodi, CA Project No 077 43452.550 <br />Abatement Equip.: Falmouth Products Falco 100 Catalytic Oxidizer Serial No.. <br />SVE Slower: 5 hprnotor, 15.5 Ami _ Max AMP Rating_ <br />Telemetry: MAX ANIP Rating: <br />Electrical Power: 230 V 3 phase - 200 amp <br />Supplemental Fuel: None �!// <br />No. of K/O barrels at site: � Full C/6 Empty <br />PART B. SVE SYSTEM DATA <br />i) <br />Elect. Meter Reading: 7c ' - r <br />System up or down upon arrival: Com' (If down please complete PART E) <br />Hourmeter Readirq: Z -7 3 3—',,,6 At time: , 3 <br />Flow Data <br />Before Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve open <br />GA" sed <br />��osro1 <br />4 <br />% Recirculation valve open <br />K/O Content l <br />%dG� <br />m arg (in H2O) <br />Va uuuW K <br />Q i. <br />O �. <br />AMPS drawn by glower motor PS <br />Total System Flow (A P. in H2O) <br />Pipe Sire <br />,a 7/ <br />%r <br />Well Field Air flow (A P. in H2O) <br />Pipe Size 4' <br />Dilution Air Flow ( A P, "H2O) <br />—Pipe Size 4' <br />FID Data <br />WI Carbon <br />W10 Carbon <br />Difference <br />S tem Influent v before dilution)1 <br />4 <br />System Influent my after dilution <br />System Effluent my <br />Field Instrument Used: 'r7Last Calibrated: i �/ <br />