My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003050
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:58:56 AM
Creation date
10/9/2018 4:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003050
FileName_PostFix
XR0003050
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.J <br />• <br />• <br />Chevron products Company <br />Former Chevron Service Station #9-5775, 30l West Kettleman Lane. Lodi, Ca[ifomia JuYh 2001 <br />CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT <br />Facility No.: 9-5775 Address: 301 West Kettleman Lane, Lodi, California <br />CHEVRON Project Manager: Robert (Bob) Cochran <br />Consulting Co./Contact Person: Secor International Incorporated (SECOR)1 Ron Chinn, David <br />Evans <br />Consultant Project No.: <br />077.43449.670 <br />Primary Agency/ReguIatory ID No.: Regional Water Quality Control Board — Central Valley Region. <br />Property Owner: Ivern and Roger Baffoni <br />WORK PERFORMED THIS QUARTER (Second Quarter -- 2001): <br />1. Conducted quarterly groundwater monitoring and sampling. <br />2. Conducted weekly operation and maintenance of groundwater extraction (GWE) and soil vapor extraction <br />(SVE) systems. Operations includes collecting physical measurements, air and water samples. Maintenance <br />includes housekeeping, repairing/replacing broken or malfunctioning equipment, and preventative/prescriptive <br />maintenance. <br />3. Prepared and submitted Second Quarter 2001 Groundwater Monitoring Report. <br />4. Prepared and submitted Second Quarter 2001 Remedial System Evaluation Report. <br />S. Prepared and submitted April, May, and June 2001 Discharge Reports. <br />6. Submitted Problem Assessment Report/Final Remediation Plan (PAR/FRP) Addendum (June 5, 2001) <br />WORK PROPOSED FOR NEXT QUARTER (Third Quarter — 2001): <br />1. Conduct quarterly groundwater monitoring and sampling. <br />2. Continue weekly operation and maintenance tasks for of groundwater extraction (GWE) and soil vapor <br />extraction (SVE) systems. <br />3. Prepare and submit Third Quarter 2001 Groundwater Monitoring Report., <br />4. Prepare and submit Third Quarter 2001 Remedial System Evaluation Report. <br />5. Prepare and submit July, August, and September 2001 Discharge Reports. <br />QUARTERLY RESULTS SUMMARY <br />Current Phase of Project: <br />Frequency of Groundwater Sampling: <br />Frequency of Groundwater Monitoring <br />Is Free Product (FP) Present On-site: <br />Current Remediation Techniques: <br />1AChevron1957751M&S12nd Quarter0112QMR01.doc <br />Remediation <br />Quarterly <br />Quarterly <br />No free product is present on-site <br />GWE and SVE <br />
The URL can be used to link to this page
Your browser does not support the video tag.