Laserfiche WebLink
L.J <br />• <br />• <br />Chevron products Company <br />Former Chevron Service Station #9-5775, 30l West Kettleman Lane. Lodi, Ca[ifomia JuYh 2001 <br />CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT <br />Facility No.: 9-5775 Address: 301 West Kettleman Lane, Lodi, California <br />CHEVRON Project Manager: Robert (Bob) Cochran <br />Consulting Co./Contact Person: Secor International Incorporated (SECOR)1 Ron Chinn, David <br />Evans <br />Consultant Project No.: <br />077.43449.670 <br />Primary Agency/ReguIatory ID No.: Regional Water Quality Control Board — Central Valley Region. <br />Property Owner: Ivern and Roger Baffoni <br />WORK PERFORMED THIS QUARTER (Second Quarter -- 2001): <br />1. Conducted quarterly groundwater monitoring and sampling. <br />2. Conducted weekly operation and maintenance of groundwater extraction (GWE) and soil vapor extraction <br />(SVE) systems. Operations includes collecting physical measurements, air and water samples. Maintenance <br />includes housekeeping, repairing/replacing broken or malfunctioning equipment, and preventative/prescriptive <br />maintenance. <br />3. Prepared and submitted Second Quarter 2001 Groundwater Monitoring Report. <br />4. Prepared and submitted Second Quarter 2001 Remedial System Evaluation Report. <br />S. Prepared and submitted April, May, and June 2001 Discharge Reports. <br />6. Submitted Problem Assessment Report/Final Remediation Plan (PAR/FRP) Addendum (June 5, 2001) <br />WORK PROPOSED FOR NEXT QUARTER (Third Quarter — 2001): <br />1. Conduct quarterly groundwater monitoring and sampling. <br />2. Continue weekly operation and maintenance tasks for of groundwater extraction (GWE) and soil vapor <br />extraction (SVE) systems. <br />3. Prepare and submit Third Quarter 2001 Groundwater Monitoring Report., <br />4. Prepare and submit Third Quarter 2001 Remedial System Evaluation Report. <br />5. Prepare and submit July, August, and September 2001 Discharge Reports. <br />QUARTERLY RESULTS SUMMARY <br />Current Phase of Project: <br />Frequency of Groundwater Sampling: <br />Frequency of Groundwater Monitoring <br />Is Free Product (FP) Present On-site: <br />Current Remediation Techniques: <br />1AChevron1957751M&S12nd Quarter0112QMR01.doc <br />Remediation <br />Quarterly <br />Quarterly <br />No free product is present on-site <br />GWE and SVE <br />