My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003052
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:59:15 AM
Creation date
10/9/2018 5:01:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003052
FileName_PostFix
XR0003052
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company Page I <br />F°rine` rChevron Service Station #19-5775, 301_West Kettleman Lane, Lodi, California _ — _�_ — October 12, 2001 <br />1 <br />0 <br />CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT <br />' Facility No 9-5775 Address 301 West Kettleman Lane, Lodi, California <br />CHEVRON Project Manager Robert (Bob) Cochran <br />Consulting Co /Contact Person Secor International Incorporated (SECOR) / Scott Gable, David <br />Evans <br />Consultant Project No 077 43449 670 <br />Primary Agency/Regulatory ID No Regional Water Quality Control Board — Central Valley Region <br />Property Owner Ivern and Roger Baffoni <br />' WORK PERFORMED THIS QUARTER (Third Quarter — 2001): <br />1 Conducted quarterly groundwater monitoring and sampling <br />' 2 Conducted weekly operation and maintenance of groundwater extraction (GWE) and soil vapor extraction <br />(SVE) systems Operations includes collecting physical measurements, air and water samples Maintenance <br />' includes housekeeping, repairing/replacing broken or malfunctioning equipment, and preventative/prescriptive <br />maintenance <br />3 Prepared and submitted Third Quarter 2001 Groundwater Monitoring Report <br />' 4 Prepared and submitted Third Quarter 2001 Remedial System Evaluation Report <br />5 Prepared and submitted July, August, and September 2001 Discharge Reports <br />' WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter — 2001): <br />1 Conduct quarterly groundwater monitormg and sampling <br />' 2 Continue weekly operation and maintenance tasks for of groundwater extraction (GWE) and soil vapor <br />extraction (SVE) systems <br />3 Prepare and submit Fourth Quarter 2001 Groundwater Monitoring Report <br />' 4 Prepare and submit Fourth Quarter 2001 Remedial System Evaluation Report <br />5 Prepare and submit October, November, and December 2001 Discharge Reports <br />' QUARTERLY RESULTS SUMMARY <br />Current Phase of Project Remediation <br />' Frequency of Groundwater Sampling Quarterly - <br />Frequency of Groundwater Monitoring Quarterly <br />Is Free Product (FP) Present On-site No free product is 2resent on-site <br />' Current Remediation Techniques GWE and SVE <br />1 11Chevron1957751M&S�3rd Quarter01k3QMR01 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.