Laserfiche WebLink
• <br />Date <br />Technician Steve Thompson <br />Site Engineer David M Evans <br />PART A GENERAL INFORMATION <br />SVEIGWE SYSTEM <br />FIELD MONITORING DATA SHEETS <br />Time of Arrival <br />Time of Departure 3 1",5 <br />Was Site Engineer contacted from hetdl Yeses l No <br />Site Location Chevron 95775, 301 West Kettleman Lane, Lodi. CA Project No 077 43452 550 <br />Abatement Equip Falmouth Products Falco 100.Catalytic Oxidizer Serial No <br />SVE Blower 5 hmotor 15 5 Amp Max AMP Rating l� <br />Telemetry `/—SDH,-� MAX AMP Rating <br />Electrical Power 230 V 3 phase - 200 am <br />Supplemental Fuel None �1 <br />No of IVO barrels at site Full <br />PART B SVE SYSTEM DATA <br />System up or down upon amval <br />Hourmeter Reading —� � � �r <br />1) <br />II) <br />is <br />Elect Meter Reading Z�, 75�7� <br />(If down please complete PART E) <br />At time <br />`t <br />Flow Data <br />Adjustment <br />After Adjustment <br />Final <br />% Dilution air valve open <br />�B-effore <br />% Recirculation valve open <br />Q <br />K10 Content [ <br />Vacuum 0 blower (in H20) <br />Gauge Range7` <br />AMPS dream bv glower motor AMPS <br />Total System Flow (e P, in Hz0) <br />Pipe Size 6 <br />Well Field Air Flow (e P, in H20) <br />Pipe Size 4" <br />Dilution Air Flow (A P. "H2O) <br />Pope Size 40 <br />FID Data <br />W/ Carbon <br />W/O Carbon <br />Difference <br />S tem Influent before dilution <br />System Influent v after dilution <br />5 tem Effluent v <br />Field Instrument Used last Calibrated `7 G <br />