Laserfiche WebLink
CLEAN-UP AND ABATEMENZ ORDER NO 5-00-704 <br />FORMER CHEVRON STATION 49-5775 <br />_301 WEST KETTLEMAN LANE <br />LODI S kN JOAQUIN COUNTY <br />Site -Specific linestigation and Cleanup Tasks (continued) <br />3 Install and continuously operate a soil vapor extraction system, and an <br />interim pump and treat system in the area of the highest soil and <br />zroundwater MtBE contamination The interim pump and treat <br />sN stem must stabilize the groundwater plume to prey ent movement <br />of AltBE toiNard Cahn Well 12 <br />Compliance Date <br />3 July 2000 <br />4 Submit a complete Problem Assessment Report (P A -R) acceptable to the 24 July 2000 <br />Board and County staff, as described in Appendix A of the Tri -Regional <br />Recommendations The PAR must include requirements for any <br />discharge permit(s) required and a time line for submittal of Report(s) of <br />Waste Discharge <br />4 <br />• <br />5 Within 15 days of Board staff approval of the Problem Assessment 28 August 2000 <br />Report, but no later than 28 August 2000, submit a Fmal Remediation <br />Plan (described in Appendix A) for the cleanup of the soil and <br />Groundwater at the site <br />6 Within 30 days of Board staff approval of the selcme;d Remedial Option, 6 October 2000 <br />but no later than 6 October 2000, implement and continuously operate, <br />the approved remediation system, with the exception of penodic and <br />scheduled maintenance Any interruption in the ope ation of the <br />cleanup system(s), other than for scheduled maintenance, without prior <br />approval of the Executive Officer, is a violation of this Order <br />Reporting and Permits <br />7 Notify the Board and County staff at least two business days pnor to any site work or sampling <br />8 Obtain all necessary local and state permits prior to b egmmng work <br />9 Submit all reports and correspondence to the Board's Sacramento Office, the San Joaquin <br />County Environmental Health Division, and all parties (or representatives) identified in this <br />Order Under penalty of perjury, the technical repor's as directed, which shall be submitted to the <br />Executive Officer of the Board, and to the County, must be signed by an appropriately licensed <br />professional (technical reports and plans, including drilling logs and soil and groundwater <br />sampling, are to be prepared, signed, and certified b1 a Registered Geologist, Registered Civil <br />Engineer, Certified Engineenng Geologist, or Certified Hydrogeologist) All registered <br />professionals must be licensed by the State of California <br />10 Submit preapprovals with workplans and all reports it ith reimbursement requests to the State <br />Water Resources Control Board Cleanup Fund in a Tamely manner to avoid delays that would . <br />result in non-compliance with this Order <br />