My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:59:56 AM
Creation date
10/10/2018 7:52:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003056
FileName_PostFix
XR0003056
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br />%%piston H Hickox <br />Stcretar3 ja <br />Ent it ownenral <br />Pi olecnon <br />19 May 2000 <br />Mr Bob Cochran <br />Chevron Products Co <br />PO Box 6004 <br />San Ramon, CA 94583 <br />Central Valley Region <br />Stet en T Butler, Chair <br />Sacramento Main Office <br />iniemet Address http /Avww swrcb ca goy/nvgcb5 <br />3443 Routier Road Suite A, Sacramento, California 95827-3003 <br />Phone (916) 255-3000 • FAX (916) 255-3015 <br />Ivern and Roger Baffoni <br />1175 Orangewood Drive <br />Lodi, CA 95240 <br />ADDENDA TO 7APRIL 2000 WORKPLAN, REMEDIAL WELL INSTALLATIONAND <br />ADDITIONAL SITE ASSESSMENT, FORMER CHEVRON STATION #9-5775, <br />301 WEST KETTLEMAN LANE, LODI, SAN JOA QUIN COUNTY <br />CLEANUP AND ABATEMENT ORDER NO. 5-00-704 <br />Gra\ DaN is <br />Goieroof <br />A 7 April 2000 Workplan For Monitoring Well Installation (Workplan) was submitted by Gettler-Ryan <br />Incorporated (GR) and approved by the San Joaquin County Environmental Health Division GR is <br />currently providing consulting services to Chevron Products Company until the soil vapor extraction <br />system and the groundwater extraction system are installed After this phase of work, consulting <br />• services will be provided by Secor International Incorporated (Secor) Secor subsequently submitted mo <br />addenda to the GR Workplan on 27 and 28 April 2000 to install remedial oxygen diffusion wells and an <br />additional well pair at the site Although the remedial oxygen diffusion wells are premature at this time, <br />I reviewed the addenda submitted <br />The 27 April 2000 Addendum and the 28 April 2000 Addendum describe installing a pair of monitoring; <br />wells southeast of the site and eight 4 -inch diameter oxygen diffusion wells along the southern perimeter <br />of the site The monitoring well pair will be installed across Kettleman Lane, and will further define the <br />extent of dissolved hydrocarbon contamination in the proposed downgradient direction The installation <br />of the monitoring well pair is approved. <br />The oxygen diffusion wells are proposed as a remedial measure to confine the dissolved hydrocarbon <br />plume at the site This application is a patented method developed at Waterloo University that uses <br />oxygen to increase biological activity and the biodegradation of petroleum hydrocarbons The <br />application involves installing an oxygen cylinder and polyethylene tubing into each of the remedial <br />wells, and charging the polyethylene tubing with 60 psi of oxygen The oxygen diffuses passively <br />through the wall of the polyethylene tubing into groundwater without bubbling or changing into the gas <br />phase A low -flow pump installed at the bottom of each well circulates water through the well column <br />Secor states that the oxygen diffusion wells will increase biodegradation of TPH, BTEX, and MtBE in <br />groundwater at the site <br />•The remedial oxygen diffusion wells are not approved at this time As presented in the Tri -Regional <br />Recommendations, a feasibility study must be conducted to evaluate remedial alternatives and submitted <br />as part of the Problem Assessment Report (PAR) Regional Board Cleanup and Abatement r j V\ h i <br />California Environmental Protection Agency MAY C 4 <br />r* Reri cleri Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.