My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003058
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 9:00:21 AM
Creation date
10/10/2018 8:13:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003058
FileName_PostFix
XR0003058
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Second Quarter 2000 Progress Report <br />Fortner Chevron #9-5775, (CAO #5-00-704), 301 West Kettleman Lane, Lodi, CA <br />QUARTERLY RESULTS SUMMARY: <br />Current Phase of Project <br />Frequency of Groundwater Sampling <br />Frequency of Groundwater Monitoring <br />Is Free Product (FP) Present On -Site <br />Current Remediation Techniques <br />Approximate Depth to Shallow Groundwater <br />Groundwater Gradient <br />DISCUSSION: <br />Remediation <br />Quarterly <br />Quarterly <br />No <br />GWE/SVE <br />53 30' to 54 37' <br />Southwest na. 0 003 ft/ft <br />July 14, 2000 <br />On April 12, 2000, Gettler-Ryan Inc (GR) advanced ten (10) GeoProbe borings to collect composite samples to be <br />used to profile soil generated during excavation at the site On May 8 and 9, 2000, approximately 900 cubic yards <br />(yds') of excavated soil were removed to a landfill in Livermore, CA <br />Between April 6 and June 5, 2000, GR extracted groundwater from well EX -1 for approximately 8 -hours per day on <br />a weekly basis Approximately 2,635 gallons of water were removed during this period Analytical results are <br />presented in Attachment B <br />iThis groundwater monitoring and sampling event was performed by GR on May 25, 2000 TPHg was reported in <br />four (4) of the ten (10) Chevron wells sampled this quarter at concentrations ranging from 162 (MW -6) to 1,390 <br />ug/I (MW -3) Benzene was reported in six (6) wells sampled this quarter at concentrations ranging from 4 61 <br />(MW -1) to 19,000 ug/I (EX -1) MtBE was reported 1n seven (7) wells at concentrations ranging from 8 28 (MW -3) <br />to 350,000 ug/I (EX -1) <br />The concentration of TPHg in MW -5 increased from below analytical detection limits to 1,140 ug/I this quarter <br />Concentrations of MtBE in MW -5 increased from 474 ug/l from the previously reported level of 83 ug/I The <br />concentrations of MtBE in EX -1, MW -6, MW -8, and MW -9 decreased this quarter to 350,000 ug/l, 378 ug/l, below <br />detection limits, and 53 4 ug/1 respectively Groundwater elevations across the site increased an average of <br />approximately 0 4 feet this quarter Groundwater flow direction was to the southwest Historical groundwater flow <br />has varied from southeasterly to southwesterly <br />The installation of the groundwater and soil vapor extraction and treatment system began on June 5, 2000 The <br />system became operational on July 3, 2000 <br />Groundwater monitoring wells MW -513, MW -813, MW -10B, MW -12A, MW -1213, MW -13, and MW -14 were <br />installed during June and July 2000 Data collected during this assessment will be reported as part of the Problem <br />Assessment Report (PAR) <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.