My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003058
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 9:00:21 AM
Creation date
10/10/2018 8:13:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003058
FileName_PostFix
XR0003058
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />0 <br />Second Quarter 2000 Site Update - Former Chevron #9-5775 (CAO #5-00-704) <br />July 14, 2000 <br />Comparison of mass removal rates to mass remaining also requires complete delineation of the plumes for <br />an accurate assessment of the initial mass Further assessment of the dissolved plume will be performed by <br />others <br />Planned Activities for Third Quarter 2000 <br />GR will continue to operate the treatment system during the third quarter 2000 As discussed in GR's letter <br />dated July 6, 2000, Schedule for Sampling the Interim Groundwater Extraction and Ti eatment System and <br />Vapor Extraction System (attached), the initial groundwater system sampling took place on July 6, 2000 <br />The groundwater portion of tile treatment system will be sampled weekly on Wednesdays at 10 00 am unless <br />notified otherwise Data from samples collected during system startup and all subsequent sample events in <br />the third quarter 2000 will be compiled in the Third Quarter 2000 Sit e Update report All analytical data <br />will be submitted to the City of Lodi within 14 days of receipt of analytical report as required in the <br />discharge permit <br />Initial sampling and inspection of the vapor system as specified in the SJVUAPCD Authority to Construct <br />#N-4343-1-0 was performed on July 10, 2000 Ms Lisa Middleton of SJVUAPCD was present to inspect <br />the system and witness sample collection The VES will be sampled once a month during the final <br />groundwater sampling conducted at 10 00 am on the last Wednesday of each month, unless notification is <br />given otherwise As required by the Authority to construct, analytical data from samples collected during <br />the initial inspection will be submitted to the SJVUAPCD by September 10, 2000 These data will also be <br />included in the Third Quarter 2000 Site Update report <br />Please call us at 916 631 1300 if you have questions <br />Sincerely, <br />Gettler-Ryan Inc. <br />C <br />Stephen J Carter, G <br />Senior Geologist <br />�ZgA Gurss <br />Sr Protect Manager <br />Attachments Figure I Vicinity Map <br />346408 07 <br />* <br />No. 5M <br />CAl-�F�Q <br />Figure 2 Site Plan <br />Figure 3 Groundwater System Process flow Diagram <br />Figure 4 Vapor System Process Flow Diagram <br />Manley's Disposal Confirmation Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.