Laserfiche WebLink
U 1 i Vr LVtll - t-ommumty 1Levelopment Department, Building inspection Division <br />* * * * * * FINAL INSPECTION APPROVALS AN CERTIFICATE OF OCCUPANC <br />--------------------------------------------------->-,._r,��,_�,--------- <br />Permit No B2038 Job Address 301 W KETTLEMAN LN LODI <br />ubdivision Lot Apn 45-140.02 (Dox � O <br />operty Owner BAFFONI, IVERN V ETAL U`^' <br />caner Address 1175 ORANGEWOOD DR LODI CA, 95240 <br />Contractor GETTLER RYAN INC Lic No 220793 <br />Contractor Address 6747 SIERRA CT SUITE J DUBLIN, CA, 94568 <br />Protect Description <br />Structure and equipment for remediation of ground contamination <br />Total Sq Fi Valuation $ 30,000 Construction Type <br />No Stories 1 No of Bdrm 0 Occupancy <br />Zoning 45 Type Project COMMERCIAL Plan No <br />------------------------------------------------------------------------------------- ----- <br />INSTRUCTIONS <br />Please Note: This form must be completed and returned to the Building Inspection Division BEFORE a <br />final inspection by the Building Division will be scheduled. Permitee is responsible for obtaining the <br />following approvals: <br />INSPECTED BY DATE <br />PUBLIC WORKS DEPT: 333-6706 f 5��45;-� <br />*,'TER/WASTEWkTER: <br />333-6740 <br />PLANNING: 333-6711 LO "OCC- e. s�Lu ; �A7 00 <br />0/5 <br />a <br />BUILDING INSPECTION: 333-6716 L <br />BUILDING OFFICIAL. ROGER G. HOUSTON <br />This Certificate is issued pursuant to the requirements of Section 109 of the Uniform Building Code, certifying that at the time of <br />issuance, this structure was in compliance with the various ordinances of the City of Lodi regulating building construction or use <br />The Building Inspection Division shares your desire to complete the final inspection phase of your project in an expeditious manner <br />However, prior to approval of final inspection, and authorization of gas service connections, the builder is responsible for contacting <br />the Departments listen a'aove and obtaining final unconditional approval from the agency or City Department <br />We Building Inspection Division will schedule a final inspection when the appropriate approval signatures have been secured and this <br />arm has been returned to the Building Inspection Division <br />---------------------------- <br />RETURN THIS FORM TO THE BUILDING INSPECTION DIVISION, WITH THE ABOVE NOTED <br />REQUIRED SIGNATURES, BEFORE A FINAL INSPECTION MAY BE SCHEDULED <br />