My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003062
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:21:27 AM
Creation date
10/10/2018 8:35:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003062
FileName_PostFix
XR0003062
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Chevron Products Company 2 <br />Former Chevron 9 5775 301 West Kettleman Lane Lodi CA December 15 2000 <br />butyl ether (MtBE), and ethyl tertiary butyl ether (EtBE) were reported in the influent <br />sample at 0 7 ug/l, 3,300 ug/l, and 147 ug/l, respectively, during the most recent <br />sampling event <br />Between October 25 and November 29, 2000, the GWE system discharged a total of <br />46,167 gallons of treated groundwater over a period of 35 days (Table 2) As of <br />November 29, 2000, the GWE system has treated a total of 73,667 gallons Calculated <br />discharge rates during the November monitoring period ranged from 0 40 to 1 19 <br />gallons per minute <br />During the November monitonng period the system extracted approximately 0 43 <br />pounds of TPHg, 0 002 pounds of benzene, and 6 90 pounds of MtBE To date, the <br />system has extracted approximately 2 56 pounds of TPHg, 0 108 pounds of benzene, <br />and 3197 pounds of MtBE <br />System Modifications <br />Weekly operation and maintenance was not performed on November 15, and 21, 2000, <br />due to the performance of an aquifer test and system modification associated with the <br />installation of groundwater extraction well EX -3 System modifications and aquifer test <br />activities are summarized as follows <br />• Between November 10 and 15, 2000, the system was shutdown to monitor <br />changes in groundwater elevations in site monitoring wells <br />• On November 16, 2000, a 2 -inch pump was installed in extraction well EX -3 <br />Groundwater was pumped and treated from EX -3 for approximately 2 -hours <br />• On November 17, 2000, a step test was performed in EX -3 Groundwater was <br />pumped and treated for approximately 5 -hours <br />• On November 18, and 20, 2000, the 2 -inch pump in EX -3 was upgraded to a 3 - <br />inch and a new transfer pump was installed in the remediation compound The <br />GWE system was then tested for approximately 3 -hours <br />• Between November 22 and 26, 2000 groundwater was continuously pumped <br />from EX -3 to monitor drawdown effects in site monitoring wells <br />• On November 27, 2000, the system was shut down to monitor groundwater <br />elevation recovery following the pump test <br />• On November 28, 2000, GWE resumed from EX -1, MW-14/EX-2, and EX -3 <br />077 41991 043/Revision of Discharge Report doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.