My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003071
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:21:18 AM
Creation date
10/10/2018 8:57:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003071
FileName_PostFix
XR0003071
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Date April 12 2001 <br />Quarter 1 Q0I <br />CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT <br />Facility No 9-5775 Address 301 West Kettleman Lane, Lodi, California <br />CHEVRON Project Manager Robert (Bob) Cochran <br />Consulting Co /Contact Person SECOR International Incorporated/ Roger Hoffimore, David Evans <br />Consultant Project No 077 43449 670 <br />Primary Agency/Regulatory ID No Regional Water Quality Control Board -- Central Valley Region <br />Property Owner Ivern and Roger Baffont <br />WORK PERFORMED THIS QUARTER (First Quarter — 2001): <br />1 Conducted quarterly groundwater monitoring and sampling <br />2 Conducted weekly operation andmamtenanceof groundwater extraction (GWE) and soil vapor extraction <br />(SVE) systems Operations includes collecting physical measurements and air and water samples <br />Maintenance includes housekeeping, repairing/replacing broken or malfunctioning equipment, and <br />preventative/prescriptive maintenance <br />3 Prepared and submitted First Quarter 2001 Groundwater Monrtormg Report <br />4 Prepared and submitted Fust Quarter 2001 Remedial System Evaluation Report <br />5 Prepared and submitted January, February, and March 2001 Discharge Reports <br />6 Conducted assessment work for completion of Problem Assessment Report/ Final Remediation Plan <br />(PAR/FRP) Addendum <br />WORK PROPOSED FOR NEXT QUARTER (Second Quarter — 2001): <br />1 Conduct quarterly groundwater monitoring and sampling <br />2 Continue weekly operation and maintenance tasks for of groundwater extraction (GWE) and soil vapor <br />extraction (SVE) systems <br />3 Prepare and submit Second Quarter 2001 Groundwater Monitoring Report <br />4 Prepare and submit Second Quarter 2001 Remedial System Evaluation Report <br />5 Prepare and submit April, May, and June 2001 Discharge Reports <br />6 Prepare and submit PAR/FRP Addendum <br />QUARTERLY RESULTS SUMMARY <br />Current Phase of Project <br />Remediation <br />Frequency of Groundwater Sampling <br />Quarterly <br />Frequency of Groundwater Monitoring <br />Frequency <br />Quarterly <br />Is Free Product (FP) Present Onsite <br />No free product is present on-site <br />• Current Remediation Techniques <br />GWE and SVE <br />
The URL can be used to link to this page
Your browser does not support the video tag.