My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003080
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2900 - Site Mitigation Program
>
PR0508132
>
ARCHIVED REPORTS XR0003080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:25:48 AM
Creation date
10/10/2018 9:32:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0003080
FileName_PostFix
XR0003080
RECORD_ID
PR0508132
PE
2957
FACILITY_ID
FA0007953
FACILITY_NAME
CHEVRON #9-5775
STREET_NUMBER
301
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
01
SITE_LOCATION
301 KETTLEMAN LN
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company 3 <br />Former Chevron 9-5775, 301 West Kettleman Lane, Lodi CA Apnl 28, 2000 <br />is OXYGEN DIFFUSER INSTALLATION <br />The oxygen diffuser will be constructed from LDPE wrapped around perforated 3 -inch <br />diameter tubing The diffuser tubes will be placed at the bottom of the well's screened <br />interval and will extend for 4 feet A low -flow diaphragm pump will be placed at the <br />bottom of the well to provide 0 25 gallons per minute (gpm) flow on a constant basis <br />The diffusers will be placed in each well and monitored on a monthly basis The <br />oxygen tank will be placed in the well, charged with oxygen, and connected to the <br />diffuser with a safety -shut-off valve should the tubing burst The system will be run <br />using minimal power requirements, and on a continuous basis The diffusers are <br />expected to require low maintenance and operate with the oxygen load for one month <br />The oxygen diffusers in the four wells on the southeastern side of the property will not <br />use pumps due to the lower level of contamination observed in this area <br />MAINTENANCE AND MONITORING <br />The required maintenance for the oxygen diffusion system will include oxygen tank <br />replacement, pump inspection, and tubing inspection Operation of the oxygen diffusers <br />will be automated (a timer for the pumps will be housed in the treatment compound at <br />the Site) Oxygen tanks will be replaced on a monthly to bimonthly basis depending on <br />the consumption rate Groundwater will be monitored on a quarterly basis as part of the <br />40 routine quarterly monitoring Dissolved oxygen, DO, and oxidation reduction potential, <br />ORP, will be monitored during quarterly monitoring to evaluate the effectiveness of the <br />oxygen diffusers <br />• <br />DATA ANALYSIS AND REPORT PREPARATION <br />The data collected from the treatment will be analyzed to assess the effectiveness of <br />oxygen diffusion treatment on TPH, BTEX, and MtBE The quantity of oxygen added <br />will be compared to the quantity of hydrocarbons predicted to be in groundwater and the <br />capillary fringe of the areas addressed by the treatment, this comparison will provide a <br />crude mass -balance on the effectiveness of the reactants <br />The report would include a description of the methodologies employed, laboratory <br />analytical results and field data, and data analysis of oxygen diffusion effectiveness <br />SCHEDULE <br />SECOR is prepared to initiate work upon installation of the oxygen diffuser wells <br />Subsequent timing of treatment will be dependent on agency approval, completion of <br />these activities is anticipated to require approximately fourteen months Data analysis <br />and reporting would be completed approximately three weeks after completion of the <br />monitoring and receipt of the laboratory analytical results <br />077 41991 500 9-5775wpaddendum2 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.