Laserfiche WebLink
Monitoring S)stem Certification <br />F. In -Tank Gauging/ SIR Equipment: ® Check this box iftank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must he completed if in -tank gauging equipment is used to perform Ieak detection monitoring. <br />Complete the following checklist: <br />® Ycs <br />❑ NO <br />Has all input wiring been inspected lex proper entry and termination. including testing for ground Faults? <br />® Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ No' <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ No* <br />Was accuracy, of system water level readings tested? <br />® Yes <br />Q No* <br />Were all probes reinstalled properly" <br />® Yrs <br />❑ NO <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />• In the Section H, below, describe how and when these deficiencies were or will be corrected <br />G. Line Leak Detectors (LLD): ® Check this box if LLIh are not installed. <br />- <br />f nw.n4t# lA� fnlMrins �6.n1c1:�. <br />❑ Yes <br />❑ No* <br />❑ NA <br />For equipment start-up or annual equipment certification. was a leak simulated to verify LLD performance'' <br />(C'herk all rhai apply/ Simulated teak rate: ❑ 3 g.p.h.; ❑ 0.1 g p.h : ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No* <br />Were all H.Ds confirmed operational and accurate within regulatory requirements? <br />Q Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No' <br />❑ N'A <br />For mechanical LLDs, does the 111) restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />❑ WA <br />For electronic LIAX dors the turbine automatically shut off if the LLD detects a leak? <br />❑ Ycs <br />Q No* <br />❑ WA <br />For electronic LLDs, dues the turbine autornaticaliy shut off if any porion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />Q No• <br />Q NA <br />For electronic I.l.lk, does the turbine automatically shut off if any portion of the monitoring s; stem <br />malfunctions or fails a test? - <br />❑ YeJLLNNo!_ <br />No* <br />or electronic .. }save al amessib a wiring connections en vsuIrnpect <br />WqMAtl items on the a uq�mem manufaOurcr's maintenance checklist completed? <br />.� ...c occ.n.a n. ucnrw. vaacr.nc wow' nota when raeX 011lelenClli were or will De COMC1190. <br />Omments: - — <br />Page S of 3 <br />18 <br />