My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANFORD
>
18501
>
2800 - Aboveground Petroleum Storage Program
>
PR0518229
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2019 8:22:27 AM
Creation date
10/10/2018 10:04:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0518229
PE
2831
FACILITY_ID
FA0013769
FACILITY_NAME
ADESA GOLDEN GATE
STREET_NUMBER
18501
Direction
W
STREET_NAME
STANFORD
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20909045
CURRENT_STATUS
01
SITE_LOCATION
18501 W STANFORD RD
P_LOCATION
03
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°P4"1" ° SAN JOAQUIN COUNTY <br />_' '—car—, :2 <br />,� ENVIRONMENTAL HEALTH DEPARTMENT <br />'. 600 East Main Street, Stockton, CA 95202-3029 <br />�P <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />\4�/FORI'1 <br />OFFICIAL INSPECTION REPORT <br />FACILITY NAME/TYPE: Adesa Golden Gate <br />DATE: Oct 13, 2010 <br />ADDRESS: 18501 W. Stanford Rd. <br />CITY: Tracy <br />ZIP CODE: 95376 <br />OWNER/OPERATOR: Facility contact. Sam MCHenery <br />TELEPHONE #: (209)839-3934 <br />TYPE OF INSPECTION: ❑ COMPLAINT ❑ CONSULTATION ❑X OTHER <br />PROGRAM 283,,, <br />ELEMENT: <br />RECORD PR0518229 <br />ID#: <br />NATURE OF COMPLAINT/CONSULTATION: <br />Facility has 2740 gallons of aboveground petroleum shell capacity and is regulated under the <br />Aboveground Petroleum Storage Act (APSA). Any facility with 1320 gallons of APSA regulated shell <br />capacity shall prepare and implement a Spill Prevention Countermeasure & Control (SPCC) Plan. <br />OBSERVATIONS/COMMENTS: <br />This facility has a SPCC Plan on site with a 5 year review date of October 5, 2010. <br />CORRECTIVE ACTIONS: <br />Verify that all aboveground petroleum storage containers at this facility are included in the SPCC <br />Plan. <br />CORRECT BY: <br />INSPECTED <br />RECEIVED BY: �' <br />DATE: <br />(/ // - V <br />EHD 48-05 Rev. 08/10/10 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.