My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN CARLOS
>
471
>
2800 - Aboveground Petroleum Storage Program
>
PR0537860
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 11:47:34 AM
Creation date
10/10/2018 10:43:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537860
PE
2831
FACILITY_ID
FA0010269
FACILITY_NAME
SPEEDEE OIL CHANGE & TUNE-UP
STREET_NUMBER
471
STREET_NAME
SAN CARLOS
STREET_TYPE
WAY
City
STOCKTON
Zip
95207
APN
08152044
CURRENT_STATUS
01
SITE_LOCATION
471 SAN CARLOS WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L'J <br />07/25/2013 15:23 2094720939 SPEEDEE OIL CH�pGE 12 <br />JUL 2 5 2013 _ <br />E NVI O N M E NTveL-L-Pdf-3.18.10 <br />This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a <br />facility that meets the applicability criteria in §112.3(8)(1), This template addresses the requirements of 40 CFR part 112. <br />Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a <br />facility attended fewer than four hours per day, at the nearest field office. When making operational changes at a facility <br />that are necessary to comply with the rule requirements, the owner/operator should follow state and local requirements <br />(such as for permitting, design and construction) and obtain professional assistance, as appropriate. <br />Facility Description <br />Facility Name <br />C71 <br />Qlc... C'..(4A'V j(-- <br />4� �j�rJrv� !JO <br />Facility Address ..,T�JfQrU.�IbS <br />^ts3 <br />City <br />State{ <br />-C-ZIP <br />Countyn .„J o� co r,, <br />Tel. Number <br />C90 r---_:s_� c 2 <br />Owner or Operator Name <br />Owner or Operator Address <br />City <br />State <br />(OA ZIP '1 5 Z- d' =� <br />County 'S"n.'J TV's I J Tel. Number <br />I. Self -Certification Statement (§112,13(a)(1)) <br />The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply <br />with the SPCC requirements: <br />M t IL -(F -TA t3 )%V•l certify that the following is accurate: <br />1. I am familiar with the applicable requirements of 40 CFR part 112; <br />2. 1 have visited and examined the facility; <br />3. This Plan was prepared in accordance with accepted and sound industry practices and standards; <br />4. Procedures for required inspections and testing have been established in accordance with industry inspection <br />and testing standards or recommended practices; <br />5. 1 will fully implement the Plan; <br />6. This facillty meets the following qualification criteria (under §112.3(8)(1)); <br />a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and <br />b. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no <br />two discharges as described in §112.1(b) each exceeding 42 U.S, gallons within any twelve month period <br />in the three years prior to the SPCC Plan self -certification date, or since becoming subject to 40 CFR part <br />112 if the facility has been in operation for less than three years (not including oil discharges as described <br />in §112.1(b) that are the result of natural disasters, acts of war, or terrorism); and <br />c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000 <br />U.S. gallons. <br />7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by §112.7(x)(2) (environmental <br />equivalence) and §112.7(d) (impracticability of secondary containment) or include any measures pursuant to <br />§112.9(c)(6) for produced water containers and any associated piping; <br />S. This Plan and individuals) responsible for implementing this Plan have the full approval of management and I <br />have committed the necessary resources to fully implement this Plan. <br />Facility Name:�r Z i�� ;: Page 1 Tier I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.