Laserfiche WebLink
L'J <br />07/25/2013 15:23 2094720939 SPEEDEE OIL CH�pGE 12 <br />JUL 2 5 2013 _ <br />E NVI O N M E NTveL-L-Pdf-3.18.10 <br />This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a <br />facility that meets the applicability criteria in §112.3(8)(1), This template addresses the requirements of 40 CFR part 112. <br />Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a <br />facility attended fewer than four hours per day, at the nearest field office. When making operational changes at a facility <br />that are necessary to comply with the rule requirements, the owner/operator should follow state and local requirements <br />(such as for permitting, design and construction) and obtain professional assistance, as appropriate. <br />Facility Description <br />Facility Name <br />C71 <br />Qlc... C'..(4A'V j(-- <br />4� �j�rJrv� !JO <br />Facility Address ..,T�JfQrU.�IbS <br />^ts3 <br />City <br />State{ <br />-C-ZIP <br />Countyn .„J o� co r,, <br />Tel. Number <br />C90 r---_:s_� c 2 <br />Owner or Operator Name <br />Owner or Operator Address <br />City <br />State <br />(OA ZIP '1 5 Z- d' =� <br />County 'S"n.'J TV's I J Tel. Number <br />I. Self -Certification Statement (§112,13(a)(1)) <br />The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply <br />with the SPCC requirements: <br />M t IL -(F -TA t3 )%V•l certify that the following is accurate: <br />1. I am familiar with the applicable requirements of 40 CFR part 112; <br />2. 1 have visited and examined the facility; <br />3. This Plan was prepared in accordance with accepted and sound industry practices and standards; <br />4. Procedures for required inspections and testing have been established in accordance with industry inspection <br />and testing standards or recommended practices; <br />5. 1 will fully implement the Plan; <br />6. This facillty meets the following qualification criteria (under §112.3(8)(1)); <br />a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and <br />b. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no <br />two discharges as described in §112.1(b) each exceeding 42 U.S, gallons within any twelve month period <br />in the three years prior to the SPCC Plan self -certification date, or since becoming subject to 40 CFR part <br />112 if the facility has been in operation for less than three years (not including oil discharges as described <br />in §112.1(b) that are the result of natural disasters, acts of war, or terrorism); and <br />c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000 <br />U.S. gallons. <br />7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by §112.7(x)(2) (environmental <br />equivalence) and §112.7(d) (impracticability of secondary containment) or include any measures pursuant to <br />§112.9(c)(6) for produced water containers and any associated piping; <br />S. This Plan and individuals) responsible for implementing this Plan have the full approval of management and I <br />have committed the necessary resources to fully implement this Plan. <br />Facility Name:�r Z i�� ;: Page 1 Tier I Qualified Facility SPCC Plan <br />